Loading…
Loading…
403 results • Best match
EXECUTION OF WORK FOR SYSTEM AUGMENTATION/STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-SAHJANWA, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
Holding clamp for LT Distribution box
In the business plan year 2026-27, work of replacing worn out AB cables under Electricity Distribution Section-Yamunapar, Prayagraj on semi turnkey basis.
DISTRIBUTION BOX
EXECUTION OF WORK FOR SYSTEM AUGMENTATION/STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-SAHJANWA, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
Laying, stringing, sagging, binding and jumpering of LT AB Cable difference size as per Estimate for LT Line with fixing of Suspension Clamp with I Hook (Insulated), dead end Clamp with I Hook (Insulated), Piercing Connector (Insulated) along with installation LT Three phas Distribution box with clamp and nuts & bolts off siz as per required
In the business plan year 2026-27, work of replacing worn out AB cables under Electricity Distribution Section-Yamunapar, Prayagraj on semi turnkey basis.
DISTRIBUTION BOX
Protection and other miscellaneous works under Electricity Distribution Division, Pratapgarh in Business Plan Scheme 2026-27 on semi turnkey basis including loading and unloading of material.
Three Phase Distribution Clamp
Capacity enhancement work of 100 to 250 KVA transformer under Electricity Distribution Division- Meja, Prayagraj in the business plan year 2026-27 on semi-turnkey basis
THREE PHASE DISTRIBUTION BOX