Loading…
Loading…
403 results • Best match
In the business plan year 2026-27, the work of capacity enhancement of 25 to 63 and 63 to 100 KVA transformers under Electricity Distribution Division- Meja, Prayagraj on semi-turnkey basis.
Distribution Box Clamp
Capacity enhancement work of 25 to 63 and 63 to 100 KVA Transformers under Electricity Distribution Division-Yamunapar, Prayagraj in the business plan year 2026-27 on semi-turnkey basis
THREE PHASE DISTRIBUTION BOX
Capacity enhancement work of 10 to 25 and 16 to 25 KVA transformers under Electricity Distribution Division- Meja, Prayagraj in the business plan year 2026-27 on semi-turnkey basis.
THREE PHASE DISTRIBUTION BOX
EXECUTION OF WORK FOR INCREASING CAPACITY OF TRANSFORMER AND SYSTEM AUGMENTATION/ STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-SIKRIGANJ, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
Laying, stringing, sagging, binding and jumpering of LT AB Cable difference size as per Estimate for LT Line with fixing of Suspension Clamp with I Hook (Insulated), dead end Clamp with I Hook (Insulated), Piercing Connector (Insulated) along with installation LT Three phas Distribution box with clamp and nuts & bolts off siz as per required
EXECUTION OF WORK FOR INCREASING CAPACITY OF TRANSFORMER AND SYSTEM AUGMENTATION/ STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-KAURIRAM, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
Laying, stringing, sagging, binding and jumpering of LT AB Cable difference size as per Estimate for LT Line with fixing of Suspension Clamp with I Hook (Insulated), dead end Clamp with I Hook (Insulated), Piercing Connector (Insulated) along with installation LT Three phas Distribution box with clamp and nuts & bolts off siz as per required
EXECUTION WORK FOR SHIFTING OF LINE AT VILLAGE BHISHA BAZAR TO MALHANPAR ROAD UNDER EDSD KHAJINI ON SEMI TURNKEY BASIS IN DEPOSIT HEAD UNDER ELECTRICITY DISTRIBUTION DIVISION SIKRIGANJ, GORAKHPUR
Mounting of Distribution Box