Loading…
Loading…
403 results • Best match
Strengthening work of 33 KV lines and 33 KV crossings under Electricity Distribution Division, Pratapgarh in Business Plan Scheme 2026-27 on semi turnkey basis including loading and unloading of material.
Installation of second point distribution transformers of different capacities under Electricity Distribution Division Lalganj, Pratapgarh in Business Plan Scheme 2026-27 on semi turnkey basis including loading and unloading of material.
Safe loading carriage from store center chilbila Pratapgarh to work site (distance 10-70 km) unloading erection of LT ABC(3*50+1*35+1*16) AND LT PVC Cable 3.5*70 SQ mm cable with complete fitting of I HOOK Suspension clamp,dead end clamp distribution box and disconnection and reconnection of cable as per respo norms
Work of increasing the capacity of distribution transformers of different capacities under Electricity Distribution Division Kunda, Pratapgarh in Business Plan Scheme 2026-27 on semi turnkey basis including loading and unloading of material.
Installation of second point distribution transformers of different capacities under Electricity Distribution Division Kunda, Pratapgarh in Business Plan Scheme 2026-27 on semi turnkey basis including loading and unloading of material.
Safe Loading, carriaging and Installation of Three Phase Distribution Box
Work of increasing the capacity of distribution transformers of different capacities under Electricity Distribution Division Lalganj, Pratapgarh in Business Plan Scheme 2026-27 on semi turnkey basis including loading and unloading of material.
Safe loading carriage from store center chilbila Pratapgarh to work site (distance 10-70 km) unloading erection of LT ABC(3*50+1*35+1*16) AND LT PVC Cable 3.5*70 SQ mm cable with complete fitting of I HOOK Suspension clamp,dead end clamp distribution box and disconnection and reconnection of cable as per respo norms
Design, Engineering, Supply, Erection, Testing and Commissioning of 220kV and 33kV GIS transformer/reactor bays along with associated works at 220kV Sub Station Electric Lane and Trauma Centre (AIIMS) on turnkey basis.
220 kV GIS SubStation Electric Lane