Loading…
Loading…
1,544 results • Best match
Kotma Water supply operation AND maintenance of 2 year
Kotma Water supply operation & maintenance of 2 year from 6.5 mld treatment plant. Intake well & distribution network including chemical material and laboratory, maintenance of control panel board, motor pump, leakage of pipe line including material etc.
CONSTRUCTION OF MAHARA GAON WATER PROJECT AT WARD NO 10, UNDER 1ST INSTALLMENT OF TIED GRANT OF 15TH FINANCE COMMISSION FOR THE YEAR 2023-24, DURING THE YEAR 2024-25 (LAST PART), (Remaining Works)
Detailed estimate for laying of Distribution Network
M and O of 11 KV substation and water supply installation at SF accn Dwarka
MAINTENANCE AND OPERATION OF 11 KV SWITCH YARD LINE NETWORK Maintenance and operation of 11 KV substation, switch gears(VCBs), HT 11 KV control panels with tripping mechanism/ back up protection system in round the clock in three shifts (each shift of 08 hours) per day by employing qualified or experienced 01 electrician in each shift including comprehensive maintenance of all HT/LT electrical equipment installed and HT/LT distribution network in Dwarka SF qtr AR society area by maintaining attendance register of staff employed all as specified and directed by Engr-in-charge. (a) Contractor shall quote his rates for maintenance and operations of sub stations and all other HT eqpt installed at 11/0.433 KV sub stations and electrical distribution network incl labour charges for replacement of spares under comprehensive maintenance. (b) The spares replaced under comprehensive maintenance shall be measured under schedule 'A' part-II (c) Details of switch gears and electrical equipments are as under :- (i) Substation 11/0.433 KV with power distribution transformer 750 KVA = 01 Nos (ii) Generator set incl control panel board 250 KVA = 01 No (iii) Monoblock pump 2.5 HP = 02 No (iv) Monoblock pump 5 HP = 04 Nos (v) LT main distribution panel board- 01 No (vi) 200 KVA automatic capacitor panel=01 No (vii) LT service panel boards- 08 Nos (viii) Fire Genr set 125 KVA=01 No (ix) Fire pump set 50 HP=01 No (x) Fire pressure pump 20 HP=01 No (xi) Monoblock pump set 7.5 HP=02 Nos (d) HT breaker (A) Electrician Note (aa) Contractor shall be responsible for any disciplinary case of staff employed(ab) Contractor shall produce character certificate (issued by Police station), 10th pass certificate ,Diploma certificate & experience certificate (minimum 02 years), of the staff employed.
Manpower Outsourcing Services - Minimum wage - Semi- skilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Manpower Outsourcing Services - Minimum wage - Skilled; Min 5th Class; Others, Manpower Outsourcing Services - Minimum wage - Semi-skilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others