Loading…
Loading…
1,540 results • Best match
Deployment of manpower for operation of scheme for 75 Days
Deployment of skilled/ un-skilled man power for Operation & maintenance of pumping machinery, rising main and distribution network storage tank etc. including watch & ward of pumping machinery,all civil structures such as pump house, water storage tank, sump well and maintenance of ornametal plants, lawns and flower beds etc. as per direction of the Engineer-in-Charge. SCOPE:- Civil Works - 24 Nos Pump House, 40 Nos Sump well, 5 Nos Slow sand treatment unit (Raw water tank, sedimentation tank, Filter Bed & clean water tank), 1 No. machanical filter, 7 Nos Percolation well, 9 Nos infilteration gallary, 32 Nos Main Storage tanks & 7 Nos. Sub Storage tank. Rising Main:- 50 mm dia to 200 mm dia= 55790 Rmts, Distribution System:- 435560 Rmt various dia 15 mm to 150 mm dia. Pumping Machinery :- 2x10 = 20 HP, 4x3= 12 HP, Main Stages 2x30= 60 HP, 2x40= 80 HP, 2x25= 50 HP, 2x30= 60 HP, 2x170= 340 HP, 2x75= 150 HP etc. Man Power to be Deployed:- (1) Pump Attendant:- 3 Nos ( For operating the Pumping Machinery). (2) Helper/ Beldar= 2 Nos. ( For operating the scheme). (3) Fitter = 2 Nos ( For maintain the Rising main, Gravity main and Distribution System). Total : 7 Nos.
A/R and M/O LWSS MS Rajpura in Tehsil Sadar District Bilaspur (SH Operation of pumping machinery and distribution system from main storage tank to different habitations under JSV Section Bilaspur for one year).
Operation of distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS M.S Rajpura whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Beldar/ Helper for running, maintenance and operation of distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
AR MO LWSS kheri Tindi Jabli WSS Jejwin Ist Phase in Tehsil Jhandutta Distt. Bilaspur HP SH Operation of pumping machinery and distributions system of water supply from sector storage tanks to different habitations for one year
Deployment of skilled/un-skilled man power for operation & maintenance of pumping machinery, rising main, and distribution network storage tank etc. including watch & ward of pumping machinery, all civil structures such as pump house, water storage tanks, sump well and maintenance of ornametal plants, lawns and flower beds etc. as per the direction of Engineer-in-charge. SCOPE:- Civil Works:- 1 No Pump House, 1 No Sump well,1 No treatment unit (Raw water tank, sedimentation tank, Filter bed & clean water tank) 2 Nos Main Storage tanks & 5 No. Sub-storage tank. Rising Main:- 1040 Rmt. (Booster stage 80mm dia 90 Rmt 1st stage 80mm dia 950 Rmt) Distribution system:- 31330 Rmt various dia 15mm to 50mm dia. Pumping Machinery:- Booster stage 2x5=10HP, 1st stage 2x30=60HP. Man Power to be Deployed:- 1) Fitter 1 No. (For maintain the Rising main, Gravity main and Distribution System) 2) Pump operator 1 No. (For operating the Booster & 1st stage) 3) Helper/Beldar 4 Nos. (For operating the 2 Nos Scheme) 4) Chowkidar 1 No. (For Pump house ). Total working hours 43 Hours per day through 7 No persons
Deployment of manpower for operation of scheme for Six Months
Deployment of skilled/ un-skilled man power for Operation & maintenance of pumping machinery, rising main and distribution network, storage tank etc. including watch & ward of pumping machinery,all civil structures such as pump house, water storage tank, sump wells and maintenance of ornametal plants, lawns and flower beds etc. as per direction of the Engineer-in-Charge. SCOPE:- Civil Works - 2 Nos Pump House, 3 Nos Sump well, 1 No.Slow sand treatment unit (Raw water tank, sedimentation tank, Filter Bed & clean water tank), 6 Nos Main Storage tanks & 7 Nos. Sub Storage tank. Rising main:- 150 mm dia= 2825 Rmts, 125 mm Dia= 2274 Rmts, 100 mm dia= 2590 Rmts, 50 mm dia = 1125 Rmts. Distribution System:- 80296 Rmt various dia 15 mm to 80 mm dia. Pumping Machinery :-Booster stage 2x5= 10 HP, 2x7.5= 15 HP, Main Stages 4x40= 160 HP, 4x25= 100 HP, 3x30= 90 HP. Man Power to be Deployed:- (1) Para Fitter = 2 No. ( For maintain the Rising main, Gravity main and Distribution System). (2) Assistant Pump Attendant:- 3 Nos (For operating the Pumping Machinery). (3) Helper/ Beldar= 2 Nos. ( For operating the scheme). Total : 7 Nos.
Deployment of manpower for operation of scheme for Six Months
Deployment of skilled/ un-skilled man power for Operation & maintenance of pumping machinery, rising main and distribution network, storage tank etc. including watch & ward of pumping machinery,all civil structures such as pump house, water storage tank, sump wells and maintenance of ornametal plants, lawns and flower beds etc. as per direction of the Engineer-in-Charge. SCOPE:- Civil Works - 3 Nos Pump House, 3 Nos Sump well, 1 No.Slow sand treatment unit (Raw water tank, sedimentation tank, Filter Bed & clean water tank), 6 Nos Main Storage tanks & 12 Nos. Sub Storage tank. Rising main:- 125 mm dia= 1200 Rmts, 100 mm dia= 1500 Rmts, 80 mm dia= 2100 Rmts, 65 mm dia= 2300 Rmts. Distribution System:- 72600 Rmt various dia 15 mm to 65 mm dia. Pumping Machinery :-Booster stage 4x5= 20 HP, 2x7.5= 15 HP, Main Stages 4x20= 100 HP, 2x30= 60 HP, 2x12.5= 25 HP, 2x100= 200 HP. Man Power to be Deployed:- (1) Para Fitter = 3 Nos. ( For maintain the Rising main, Gravity main and Distribution System). (2) Assistant Pump Attendant:- 3 Nos (For operating the Pumping Machinery). (3) Helper/ Beldar= 3 Nos. ( For operating the scheme). Total : 9 Nos.
Work of Augmentation of Water Supply System of Tonkkhurd town under AMRUT 2.0 at Tonkkhurd Dewas M.P.
Survey, Soil investigation, Design and Construction of a. Construction of 2 Nos. of Dug well and 5 Nos. of Tube Well b. Construction of Sump Well having capacities of 50, 100, 150 KL Installation of clear water pumps for pumping water up to 25 HP. c. Providing, laying, jointing, testing, commissioning of clear water pumping main having length of 6900 m of dia 100-250mm of DI-K9 including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete. d. Construction of overhead reservoirs having capacities of 120, 300, 320 KL and staging height of 18 m e. Providing, laying, jointing, testing, commissioning of distribution network having length of 6357 m of dia 110 – 280 mm and of HDPE pipe including excavation, refilling, road cutting/dismantling, restoration, providing valves, specials and fittings all complete. f. Providing house service connections g. PLC- SCADA for monitoring and controlling of water supply system