Loading…
Loading…
1,566 results • Best match
Annual maintenance work of 220 132 33 kV Grid Sub Station Giridih for the period from 01 05 2026 to 31 03 2027 for FY 2026 27
Supply of Manpower for Preventative / Routine Maintenance of Grid Substation as per schedule provided by Engineer in-charge:-
Relocation of Server Room from Ground Floor to First Floor
Supply and installation of PDB in UPS output, for redundant power distribution in Network racks.
Installation of Deep Tube Well by DTH Rig Boring including necessary accessories for water supply arrangement at Rajaduar Ananda Nagar, North Guwahati under Guwahati Division No.-l under SOPD-G for the year 2025-26
Laying,fitting ,fixing,testing & commissioning of Distribution Network 9.1.1 Earth work in excavation in foundation trenches including refilling the quantity as necessary after completion of works of pipe line dressing, ramming, watering etc. and removal of surplus earth with 50 m lead and lift up to 1.5 m all complete including dewatering as directed including bailing out water where necessary. (b) Blastic land, tillah soil, hard soil, soil mixed with moram gravel and boulders upto one man size
Supply of electrical store materials for day to day maintenance of EI at the Hospital campus of COM and JNM Hospital Kalyani Nadia for the year 2025-26
Supply of 230/240 V, 18" (450 mm) 4 (four) Blades Air-Circulator Pedestal Fan complete with all accessories such as Regulator, Cord and 16 Amp. 3-pin Top (Make - EPC Electrical Pvt. Ltd., Heavy Duty).
MAINTENANCE OF 10 NOS TUBEWELL AND 2 PUMPHOUSE OF RURAL WATER SUPPLY SCHEMES IN GRAM PANCHAYAT DAWRI and BALIDAD KI BASTI UNDER SUB DIVISION RURAL CITY DIVISION JAISALMER
Based on O&M PHED BSR 2020 7.1 -- Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution / rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering, JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the area. Minimum labour required for following kms pipelines:
Operation and maintenance of Rural water supply scheme Peepalda Tehsil Peepalda District Kota
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department.