1,562 results • Best match
Additional Patalganga Industrial Area.......Providing Power supply infrastructure to plot no M-1 and M-2 at Sarsai
Sub Estimate no.04 Providing 22KV O/H Distribution Network at plot no M-1 & M-2 at Sarsai Item no.01 Steel Poles (OH-PL) 1.1 Supplying and erecting rolled steel joist (girder) pole 100 x 116 mm (23 kg/m) with base plate in provided foundation as per specification no. OH-PL/RSJ
Construction of One room for Godown Incharge under Oilseed Seed Hub scheme, PORS, Berhampore, Murshidabad.
S & D of 9" (300 mm) dia 1420 r.p.m. heavy duty sweep AC exhaust fan complete with all accessories having the following Model / Cat No. (Make : EPC Electrical Pvt. Ltd.)
Construction of OHT Tube Wells Pump House Toilet Boundary wall and Laying and jointing of Rising Main and Distribution system of Sankriti Lok Colony Water Supply Scheme under SASCI Programme.
Distribution Network Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
PROVN OF CHILLED WATER TYPE CENTRAL AC PLANT UNDER ADDN/ALTN TO BLDG NO P-1217 AT AF STN GWALIOR
Item no 1.00 continued.../ Notes (i) The rate shall be inclusive of Designing of Complete AC plant. Contrtactor shall submit the detailed Design & complete working drawing of AC plant including heat load calculationa, plant layout, Air distribution network layout, electrical panel details dully vetted by IIT / NIT (Relevant department). Certificate of sound design shall be on official letter pad of IIT / NIT. Complete set of design of drawing shall be submitted for approval of Accepting Officer within 01 Months from date of commencement of work as per Work order No. 1 (ii) The completion of the work shall be issued in phased manner. Provisional completion of the work shall be issued After physical execution of the work at site complete in all respect/ phase I test as specified. (iii) The Phase -II ( summer / mansoon / winter ) Tests shall be carried out by Sr IEM HQ CE (AF) Prayagraj Zone / Rep of Accepting Officer. (vii) The Defect liability period of the contract shall be start as per condition 46 of IAFW 2249 General condition of contract (24 Months after the provisional completion of phase-I tests)
PROVN OF CHILLED WATER TYPE CENTRAL AC PLANT FOR RCC SHED AT AF STN GWALIOR
Note : - (i) Complete Chiller system shall comprises of not less than 100TR capacity ( 02Nos. Working Each 50 TR) + 01 Standby 50% capacity of chiller unit (ii) The rate shall be inclusive of Designing of Complete AC plant. Contrtactor shall submit the detailed Design & complete working drawing of AC plant including heat load calculationa, plant layout, Air distribution network layout, electrical panel details dully vetted by IIT / NIT (Relevant department). Certificate of sound design shall be on official letter pad of IIT / NIT. Complete set of design of drawing shall be submitted for approval of Accepting Officer within 01 Months from date of commencement of work as per Work order No. 1 (iii) The completion of the work shall be issued in phased manner. Provisional completion of the work shall be issued After physical execution of the work at site complete in all respect/ phase I test as specified. (iii) The Phase -II ( summer / mansoon / winter ) Tests shall be carried out by Sr IEM HQ CE (AF) Prayagraj Zone / Rep of Accepting Officer. (iv) The Defect liability period of the contract shall be start as per condition 46 of IAFW 2249 General condition of contract (24 Months after the provisional completion of work under phase-I)
NIT 14 AUGMENTATION OF PIPED WATER SUPPLY SCHEME OF VILLAGE DEVPURA GP JAISINGHPURA FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTIONS UNDER JJM, TEHSIL CHOMU, DISTRICT JAIPUR
Survey by Electronic Total station/DGPS of villages with a view of preparing "village index plan "indicating roads/ streets, surface and width of road/ streets along with places of importance such as Panchayat Bhawan, Hospital, School, Post office, Temple Water Supply structures (GLRs, PSPs, pumping station physical boundary of village north etc. including levels at some important points as per instruction of engineer in charge. Hydraulic Design of Distribution network in Loop/Water Gem/EPANET or any other compatible software. Preparation of Auto CAD Drawing (A-3/A-2) with complete hydraulic design out put details, such as pipe no, node no, pipe length, pressure at node etc. Submission of three sets of colour print prepared in Auto CAD. For Length Up to 2.5 KM