Loading…
Loading…
1,793 results • Latest
Construction of Devarmal to Dholnar Road Length 3.00 Km.
Road Markers/Road Stud with Lens Reflector (Providing and fixing of road stud 100x 100 mm, die cast in uminum, resistant to corrosive effect of salt and grit, fitted with lens reflectors, installed in concrete or asphaltic surface by lling hole 30 mm upto a depth of 60 mm and bedded in a table bituminous grout or epoxy mortar, all as per BIS:873, part- IV:1973)
SPECIAL REPAIRS TO BUILDING NO P-34 (SAILORS MARRIED ACCOMODATION) AT NAUVEER NAGAR AND AREA DRAINAGE NEAR MT WATCH TOWER AT NAVAL BASE INS DWARKA OKHA UNDER GE NAVY PORBANDAR
S&F in repair sink with drainage board made of stain finish 1 mm thick kitchen or laboratory with plugs washers including bedding in cement mortar to dwarf wall or including fixing cantilever brackets overall size 915mm x460mm bowl size 410mmx330mmx160mm complete all as specified and directed/approved by Engr-in Charge.
Construction of Bridge in Biswanath district i) Br. No. 1/2 on NH-15 to Dubia Borigaon Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Biswanath/32
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810. i) Bridge No 1/2 of NH-15 to Dubia Borigaon Road
Construction of Bridge in Sonitpur district i) Br. No. 1/1 on Bhakatgaon (Khalihamari) to Buragaon Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Sonitpur/26
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810. i) Bridge No 1/1 of Bhakatgaon (Khalihamari) to Buragaon Road
Construction of Bridge in Biswanath district i) Br. No. 2/2 on Jaranigaon to kakila Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Biswanath/33
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810. i) Bridge No 2/2 of Jaranigaon to kakila Road
Imp. to Left Bank Service Road on Biswanathpur Minor from RD 1.30Km. to 2.50Km. (Near Village Charikpadia to Palapenda).
Earthwork in all kinds of soil except sand, sandy or slushy soil in borrow area by mechanical means and transportation of excavated earth by mechanical means with all leads, lifts, delfts, rehandling, conveyance, royalty,EMF,DMF,Additional charges of materials, labour cess, including loading and unloading the same on prepared and approved surface including rough dressing and breaking the clods to maximum 5 cm. to 7 cm. in size and laying in layers not exceeding 22.5 cm.layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area with labour, T & P etc. complete as per direction of the Engineer-in-charge. (Earth will be arranged by the bidder at his own cost and risk. Earth should be free from clods, roots, brickbats and other debris.. Measurement of the fill to be taken on the finished level section) only