Loading…
Loading…
11,804 results • Best match
5 Nos of blocked culverts , RCC drain with covers slabs,BM BC,tile work, Traffic safety work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Construction of remaining road work at infront of shivanna house maruthi nagara cross road in w no 1, beside Ramakrishna college road infront of Vasanth Raju house in w no 3, infront of Lakshmishanagara Dasegowda house in w no 11 cmc ckm limits
Construction of remaining road work at infront of shivanna house maruthi nagara cross road in w no 1, beside Ramakrishna college road infront of Vasanth Raju house in w no 3, infront of Lakshmishanagara Dasegowda house in w no 11 cmc ckm limits
Open tender for Zonal works from UDL (excluding) to SNT(excluding) in AS chord line for repairs and maintenance work including ,road, wood & pipe/sanitary works of all staff quarters & service building under SSE/Works//Pandabeswar in zone no.15 of Asansol division for the period commencing from 01.07.2026 to 30.06.2027.
Construction of coverd RCC strom Water Drain and CC road work in front of koushalya vatika Apartment, Under Zone 04. (4thcall)
Construction of coverd RCC strom Water Drain and CC road work in front of koushalya vatika Apartment, Under Zone 04. (4th call)
Road Work
Road repair/Re-carpeting of Thermal Power House Colony, Sector-23, Faridabad. (Refer Annexure HSR ITEMS)
ROAD WORK
Quarrying, collecting, supplying hard granite stone boulder of size not less than 0.0025 cum from approved quarry free from weathered skin surface and other deleterious materials, packing the stones in rip raps and slope protection works in the river embankment to required profiles in all heights and depths including filling the interstices with small stones , wedging and hammering etc including cost, conveyance, labour, T and P required for the work, royalty, taxes, cess, hire and running charges and transportation of all materials of approved quality with uniform colour and texture with all leads, lifts, delifts handling with uniform colour and texture with all leads, lifts and delifts handling and rehandling etc including all other incidental charges required to complete the works as per specification and direction of the Engineer-in-charge.