Loading…
Loading…
10,283 results • Best match
Refer to BOQ
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, ...
Construction of a covered drain and CC road in Ward Brahmnitola 01 Indiranagar extending from Rizwan house passing by the houses of Puttan and Tahir Alam upto Baba Teli house and the adjoining lane.
Construction / Upgradation of lane / drain at lane no 7 gurha Keran near h/o Chandri Manhas at Bantalab and const of road and Drain at Upper Thather near Farmana Kouser in W No 63
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
CONSTRUCTION OF MAJOR BRIDGE ON PIPARKHEDA GIRAD PACHORA KHADAKDEOLA WARTHAN SHELGAON BABRA KANHORI PHULAMBRI ROAD SH-48 AT CH. 75/950 ACROSS PHULMASTA RIVER IN PHULAMBRI TOWN TQ. PHULAMBRI DIST. CHHATRAPATI SAMBHAJINAGAR
CONSTRUCTION OF MAJOR BRIDGE ON PIPARKHEDA GIRAD PACHORA KHADAKDEOLA WARTHAN SHELGAON BABRA KANHORI PHULAMBRI ROAD SH-48 AT CH. 75/950 ACROSS PHULMASTA RIVER IN PHULAMBRI TOWN TQ. PHULAMBRI DIST. CHHATRAPATI SAMBHAJINAGAR (Refer Detailed Schedule "B" attached In the tender documents for itemwise details of work)
Performance Based Maintenance Contracts (PBMC) for Maintenance of Nanded Udgir Togari Section of NH50 from Km 0.000 to Km 111.409 in the State of Maharashtra and Construction of Service Road of ROB in Udgir City on NH50 for 5 Year Maintenance Period
Construction of service road of ROB in Udgir city on NH-50 with maintenanace period of 5 years
Refer to BOQ
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge : All Kinds of Soil