Loading…
Loading…
10,095 results • Best match
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction-PMJANMAN
Road/Bridge Work
SPECIAL REPAIR WORK OF SH, VILLAGE ROADS & BRIDGE/CULVERT UNDER P.W.D. (B&R) SUB DIV. SARAIPALI MAHASAMUND
... bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal... Removing all type of hume pipes and stacking within a lead up to 1000 meters including earthwork and dismantling of masonry works around pipes. Up to 1000 mm dia
Ordinary Repair and Patch Repair Work on various roads of PWD Div. Pali for FY 2026-27 under Rate Contract.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of ...
Repair and improvement work on various roads in Barkheda Development Block, Pilibhit district addressing shoulder damage and washouts caused by rain
Renewingpatries ncludingdressingsurfacefillingupto8cm(3")depth andmakingnamunas,atevery15metreapartoneithersideof theroad truetopatri templatewithsideslopesof1:2etc. trenchesfor takingthe earth to be so dug that they forma continuous sidedrain at road boundary. (SI. No. 764)
Repair and improvement work on various roads in Bisalpur Development Block, Pilibhit district addressing shoulder damage and washouts caused by rain
Renewingpatries ncludingdressingsurfacefillingupto8cm(3")depth andmakingnamunas,atevery15metreapartoneithersideof theroad truetopatri templatewithsideslopesof1:2etc. trenchesfor takingthe earth to be so dug that they forma continuous sidedrain at road boundary. (SI. No. 764)
Repair and improvement work on various roads in Lalorikhera Development Block, Pilibhit district addressing shoulder damage and washouts caused by rain
Renewingpatries ncludingdressingsurfacefillingupto8cm(3")depth andmakingnamunas,atevery15metreapartoneithersideof theroad truetopatri templatewithsideslopesof1:2etc. trenchesfor takingthe earth to be so dug that they forma continuous sidedrain at road boundary. (SI. No. 764)