Loading…
Loading…
10,475 results • Best match
PMGSY road to Kandra_Road_Pothole repair with WBM-III, SDBC, earthen shoulder and earthen drain cutting_0.000 to 3.740
Providing & applying primer coat with Bitumen emulsion on prepaired sueface of granular base including cleaning the road surface and spraying primer @ 0.60kg / sqm using mechanical means as per clause 502 of MoSRT & H specification for road & bridge works etc complete as per direction of EIC..
MDR To Potenda via Maligam_Road_Pothole repair, SDBC ,earthen shoulder _0.000 to 2.420
Providing & applying primer coat with Bitumen emulsion on prepaired sueface of granular base including cleaning the road surface and spraying primer @ 0.60kg / sqm using mechanical means as per clause 502 of MoSRT & H specification for road & bridge works etc complete as per direction of EIC..
Ward No. 09 Construction of drains and CC tile roads in Chaupula Bagiya (Lane Nos. 02 03) spanning the stretch from Mohits house, past Gurpreets house, up to Surendra Chaudhary house, as well as the link lane from Munna Lals house to Indals and P.
Dismantling of old damage BOE C.C. tiles Road work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Road/Bridge Work
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Road/Bridge Work
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Road/Bridge Work