Loading…
Loading…
10,932 results • Best match
Annual rate contract for gravel road construction work on the way to Muktidham in village Bargu under the MNREGA scheme
Urgent repair works 2.00 kmp to 4.00 kmp in patches Gopalchak -Talla Road under Haldia Construction Sub-Division No-I in the District of Purba Medinipur in the year 2026-2027.
Prime Coat :- Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). i) For WBM / WMM Surface: (with primer @ 0.70-1.0 kg/sqm)
Urgent repair works 1.00 kmp to 2.00 kmp in patches Basulichak-Boga Road under Haldia Construction Sub-Division No-I in the District of Purba Medinipur in the year 2026-2027.
Prime Coat :- Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). i) For WBM / WMM Surface: (with primer @ 0.70-1.0 kg/sqm)
FDR-2025-26-Thettath Poothakandy Road -Kunnamangalam GP -General civil works
Road work
WORK High mask work At Muktidham Neemuchcity Road NEEMUCH
WORK High mask work At Muktidham Neemuchcity Road NEEMUCH
Construction and Development Work of Internal Road, Sewer, Water Line and Drain in 21 Commercial Plots in Sector-2C, Sikandra Yojna, Agra.
Earth work in cutting in ordinary soil excavation to be in the form of a regular pits mot exceeding 0.50 m in depth and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50 m distance as directed by the Engineer-in-Charge. (Small work) For Road Work 12.00 m wide road