Loading…
Loading…
10,928 results • Best match
C.C./DAMAR PHED ROAD CUT/CONSTRUCTION WORK IN SURAJ NAGAR AND GANESH NAGAR-II AND SURROUNDING AREAS LOCATED IN WARD NO. 09
Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil
Additional work of Construction of Approch Road by Paver Block at Ranaghat sanitary land fill site in Anulia under Solid Waste Management.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) for works in foundation, basement and upto roof of ground floor / upto 4m. (i) Tor steel/Mild steel in ground floor. II.JSW/JSPL/SHYAM/BMASL/ELECROSTEEL/SSL
CONSTRUCTIONS OF APPROACH ROAD AT KNYA SHIKSHA PARISAR SENDHWA.
Construction of Approach Road At Kanya Shiksha Parisar Sendhwa.
Special Repairing Works at BARDOLI (HIGHWAY) BUS STATION @ SURAT DIVISION.
1 Special Repairing Works at BARDOLI (HIGHWAY) BUS STATION
Length of the road proposed in this work is 100m out of total length 250m.Formation and paving tile works are included in this estimate. Dry rubble masonry wall for foundation and super structure over a row of coconut piles, etc
RING BUND Type II Putting up ring bund with earth filled gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work. etc. complete
Provision of various station improvement works as detailed in the Scope of the work at Vasai Road station and Virar Station in connection with proposed 5th and 6th line in between Borivali and Virar Stations of Western Railway Under MUTPIIIA
Providing design mixed M-35 grade Reinforced Cement Concrete produced from approved microprocessor controlled automatic batching plant for RCC bridge work with Maximum aggregate size of 20mm crushed graded stone aggregate and sand of approved quality including all lead & lift, dewatering, weigh batching, mechanical mixing, compaction, curing including using all types of form work, shuttering, centering, scaffolding, providing necessary arrangement for fixing OHE mast & bolts etc. complete with all contractors labour, cement, material, construction chemicals such as plasticizer, retarder etc, plants & machineries with all lead & lift complete as per technical specifications. (Minimum content of Cementitious material shall be 400 Kg per cum of concrete and Maximum Water Cement Ratio 0.40. Minimum content of Ordinary Portland cement shall be 300 kg per cum of concrete. Fly ash or GGBS or Micro Silica can be used as other cementitious material). Note:- 1. Rate is inclusive of Chloride free admixture such as super plasticizer. 2. Only construction joint shall be permitted. 3. Form work shall be approved by Engineer- in -charge before use. 4. The contractor shall install automatic batching plant of suitable capacity or use RMC for the concreting work, except for the location and components of work permitted by engineer’s in charge for use of mechanical mixer at site. For such concreting without RMC, deduction at the rate of Rs. 300/- per cum will be made from payment. 5. Steel reinforcement will be paid separately. 6. Rates are excluding of permanent shuttering and permanent form work in case of item no. 14(d) for deck slabs/ extension to deckslabs of FOBs, elevated decks, skywalks, staircases, etc. where the decking sheet/ steel sheet are provided for safety in OHE and crowded area in this case decking sheet/steel sheet paid separately. 7. Rates are inclusive of temporary form work of approved quality and material for temporary side/bottom shutterings, staging and scaffolding, dewatering, placing using pumps/placer boom/crane & bucket, compaction, finishing the surface and curing of concrete with all contractors tools, plants, labours and materials of approved quality, all lead and lift, crossing of track, etc complete as per specification & direction of Engineer -In-Charge.