Loading…
Loading…
10,960 results • Best match
Laying Of Pipeline Work From The Main Road To Subhas Nagara In Lokapur Town from The Main to Subhas Nagar Installation Of 3 inch Pipelines From Jnaneshwar matha To Bhayar Oni Installation Of 3 Inch Pipe From Rammana Killari Mane in Venketeshwar Nagar ... Pipelines Works From ... Yadawad Road To ...
Laying Of Pipeline Work From The Main Road To Subhas Nagara In Lokapur Town from The Main to Subhas Nagar Installation Of 3 inch Pipelines From Jnaneshwar matha To Bhayar Oni Installation Of 3 Inch Pipe From Rammana Killari Mane in Venketeshwar Nagar to the over head tank 3 inch Pipelines Works From Yadawad Road To Bridge To Galli Durgadevi GudI
T02-Gelling Road to Barasamsing and 3 other works as per NIT
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface,including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702
Construction work of interlocking road, RCC drain and cover from Mohan Nishad house to Saurabh Verma house till Shiv Mandir in Kuchhechha
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:(All kinds of soil) As per DSR-2.1.1
Ward No 11 Subhash Nagar (Chirana) Construction work of CC road and drain from Ram Vilas Paswan house to Suresh Valmiki house
Ward No. 13 Shivpuri (near Gusai Baba) Construction work of CC road and drain from Kushwaha ji plot to Sumit Sharma house
Ward No 08 Sardar Patel Nagar (Maujipurwa) Construction work of CC road and drain from Chhote Kuril house to Banshilal Kuril house