Loading…
Loading…
10,961 results • Best match
Construction work of Inter Loking from Karan house to Narendra Fauji house on Vaira Hinoti main road in village Bhaura Block Sikandrabad.
E/W in cutting or in embankment in ordinary soil excavation to be In the from of regular pits not exceeding 0.50M in depth and earth work in embankment to be in 20cm. Layers including remming and dressing the surface to required levels and slopes and also including 1.50M lift and 30M. lead the earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30M distance as but 8.00km cartage soil directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (where machine con not reach/move) as per S.I. No. 253(a)
Construction work of Inter Loking from Pappan house to Hardayal house from Bhatte Wale main road in Block Sikandrabad in village Bhaura
E/W in cutting or in embankment in ordinary soil excavation to be In the from of regular pits not exceeding 0.50M in depth and earth work in embankment to be in 20cm. Layers including remming and dressing the surface to required levels and slopes and also including 1.50M lift and 30M. lead the earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30M distance as but 8.00km cartage soil directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (where machine con not reach/move) as per S.I. No. 253(a)
2. Construction work of interlock road and drain from Krishna Om house to Dr. Veer Pal Singh house in Mo. Gayatri Nagar.
R.C.C work with cement Approved coarse sand and 2cm gauge approved stone ballast in proportion of 1:2:4 etc slab works etc….all comp As per P.W.D.S.I. NO. 284
Lohamandi Zone, Ward No. 76 Road construction work using hot-mix (from the Police Hospital to Family Quarter No. 01). Send feedback
Providing & Applying priming coat with bitumen emulsion on on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0-70 Kg./Sqm. Using machanical means. Before Applying prime coat. The surface will be cleaned with Machanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime Coat will be applied 24 Hrsbefore the application of bituminous course including all taxes, Material, Labour, T&P etc. required for proper copletion of the work.
Balance Work for Construction of link road from Padyarna to Puller by way of earthwork and walling, const. of 6m span RCC culvert
17.95 Construction of granular sub-base by providing close" graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor graderon prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.17.95.2 With material conforming to Grade-11 (size range 53 mm to 0.075 mm) having CBR Value-25
Laying Of Pipeline Work From The Main Road To Subhas Nagara In Lokapur Town from The Main to Subhas Nagar Installation Of 3 inch Pipelines From Jnaneshwar matha To Bhayar Oni Installation Of 3 Inch Pipe From Rammana Killari Mane in Venketeshwar Nagar ... Pipelines Works From ... Yadawad Road To ...
Laying Of Pipeline Work From The Main Road To Subhas Nagara In Lokapur Town from The Main to Subhas Nagar Installation Of 3 inch Pipelines From Jnaneshwar matha To Bhayar Oni Installation Of 3 Inch Pipe From Rammana Killari Mane in Venketeshwar Nagar to the over head tank 3 inch Pipelines Works From Yadawad Road To Bridge To Galli Durgadevi GudI