Loading…
Loading…
11,036 results • Best match
Road and drain construction work around the toilet from Har Nam Singh house to Gudda Kori house under Shitlamai ward. (Parshad Anushansa)
Work Name
Road construction work by hotmix plant from Idgah chauraha to House No. 111/479, Harsh Nagar under ward- 37/05 zone- 4.
Earth Work-earth work 2.1 (2.1,1) work in surface excavation not exceeding 30 cm in depth but ceeding 1.5 m In width as well as 10 sqm on plan including getting out d disposal of excavated earth upto SO m and lift upto 1.5 m, as directed Engineer-in- Charge: 2.1.1 All kinds of soil.o 0.30 M
Mud and brick-paved road (Kharanja) construction work from Kalyan Singh s orchard to Chandrapal Singh s field in village Haldwa Mafi.
Earth work in cutting or in embankment in ordinary soil with 2.00 Km cartage including ramming and dessing the surface to requied levels & slopes& also inclulding 1.5 lift & 30m lead i/c all labour material T&P complete. as per Sanction S.E. R.E.D. MBD Letter No. 1121 Date 30-03-2026
Construction work of RCC road from Bhrigumuni Chowk to Chhath Puja proposed bridge in Panki under Zone-6 Ward-19 (Ratanpur Panki)
Providing and applying 2.5 mm thick road marking strips (retro-reflective) of specified shade/colour using hot thermoplastic material by fully/semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-incharge and
Package II Construction of Coffer Dam US and DS Stage I Road Tunnel and Civil and HM works of Diversion Tunnel for Kalai II HEP 1200 MW AP
Total of Schedule–1 (Civil Works)
Road Safety Improvement Works for 3 corridors covering 21.80km in Tamil Nadu
Road Markers/Road Stud with Lens Reflector Providing and fixing reflective road studs of ‘category A’ Raised pavement markers made out of poly carbonate / methyl methercrylate/ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MoRT&H circular No RW / NH. 33023/10/ 97-DO. III dt 11.06.97. The height, width and length shall not be less than 15 mm, 90 mm and 100 mm and with minimum reflective area of 13 Sq.cm on each side and the slope to the base shall be 35 (+/-) 5 degree. Each reflector shall have a CIL not less than values specified in Table 2 of said MoRT&H circular. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 (+/-) 2mm and height not less than 30 (+/-) 2 mm) from the body is to be a minimum value of 500 Kgf. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35 - 2015 guidelines and MoRT&H specification 804 etc., complete