Loading…
Loading…
11,175 results • Best match
Road
Road renovation-construction of drain
Construction of Vidisha Railway Station Madhav Ganj Chouk Main Road to Pedi School, Chanakya road to Bajariya Jhaki Chouk Via Shivaji Chouk length 2.30 km. PAC 663.82 lacs 9th Call on Road and Bridge SOR 11-04-25 work period 300 days I/c rainy se
Construction of Vidisha Railway Station Madhav Ganj Chouk Main Road to Pedi School, Chanakya road to Bajariya Jhaki Chouk Via Shivaji Chouk length 2.30 km. PAC 663.82 lacs 9th Call on Road and Bridge SOR 11-04-25 work period 300 days I/c rainy season
Repair and Improvement work of Takrohi Road via Jai Vihar Deendayal puram Road
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Road signage work at Puliya Nihal Singh to Asan Chauraha Firozabad Jalesar Road
Road Marking with Hot applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.50 mm thick including reflectrorising glass beeds @ 250 gms. per sqm area thickness of 2.50 mm is excludive of surfae applied glass beeds as per IRC:35. The finished surface to be level, uniform and free from streaks and holes (chapter 20, no. 24)
Construction work of a drain and cement concrete road from Shankar to Wasim house on Ward No. 06 Moh. Azad Road, from Haroon to Chaman house, and from the mosque bridge to Akbar house. (Length 111.40, Width 3.10)
Dismantling brick work or Stone Work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet).
MLA SDF 2025 26 Aroor LAC Smt Daleema Jojo MLA Construction of Panakkekkalam Indamthuruthu road in ward 17 of Thuravoor GP General Civil Work
OD27696/2026-2027:Construction of embankment with approved material obtained from borrow pits , transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (WITH POWER ROLLER)