Loading…
Loading…
11,092 results • Best match
DEVELOPMENT OF ULTRA MODERN APPLE, FRUIT and VEGETABLE MARKET AT PINJORE (PHASE-II) BALANCE ROAD WORK
Development of Ultra Modren Apple, Fruit and Vegetable at Pinjore PH-II Balance Road work
JUNCTION IMPROVEMENT & ROAD FURNITURE WORK OF BOULI UMARIYA KHARSOLA ROAD, SARGAON PATHARIYA ROAD, SALFA MOTIMPUR DHUMA AMALDIHA ROAD (MDR) & MUNGELI-BYPASS RAOD (ODR), UNDER SUB DIVISION MUNGELI & CRASH BARRIAR WORK ON KOTA LORMI PANDARIYA ROAD (SH-10) UNDER SUB DIVISION LORMI, DISTT. MUNGELI
Road Widening Work From Khatima Chauraha To Tharu Vikas Bhawan.
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
STRENGTHENING WORK OF OLD TONKKHURD BYEPASS ROAD LENGTH 0.90 KM
STRENGTHENING WORK OF OLD TONKKHURD BYEPASS ROAD LENGTH 0.90 KM
WMM Patch Repair Work of Road Under Sub Division Madded.
CRIF 2022 23 Re Construction of Vengannur bridge across Gayathri river in Alathur - Maruthamthadam road in Palakkad District in the state of Kerala under Setu Bandhan Bridge Construction General Civil Work 1
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-