Loading…
Loading…
10,933 results • Best match
B.T. Renewal work Padlyamata to Dugya road length 3.72 km PAC 83.86 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
B.T. Renewal work Padlyamata to Dugya road length 3.72 km PAC 83.86 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
B.T. Renewal work Sultaniya to Babaldi road length 3.58 km PAC 80.77 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
B.T. Renewal work Sultaniya to Babaldi road length 3.58 km PAC 80.77 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
STRENGTHENING WORK OF HADLAYKHURD TO LASUDLIYA MALAK ROAD LENGTH 2.40 KM INCLUDING ELECTRIC POLE SHIFTING WORK UNDER SUB DIVISION SHUJALPUR
STRENGTHENING WORK OF HADLAYKHURD TO LASUDLIYA MALAK ROAD LENGTH 2.40 KM INCLUDING ELECTRIC POLE SHIFTING WORK UNDER SUB DIVISION SHUJALPUR
Annual Plan-2026-2027/PALA MUNICIPALITY- 18/27 KALLARACKAL ROAD JASMINE ROAD MAINTENANCE WARD 17-General Civil Work
Jasmin road
Annual Plan-2026-2027/PALA MUNICIPALITY-PROJECT NO. 04/27-AKKAKUNNEL ROAD MANGALAM ROAD ST THOMAS ROAD MAINTENANCE-WARD 4-General Civil Work
Road Retarring & Side Concreting
Baraka_Purulia Road Netaji Setu and Approach from 6.00 to 6.50 km patch repairing in stretches for pre monsoon work under within the jurisdiction of Asansol Construction Sub- Division under Asansol Division P.W.D. in the dist. Of Paschim Bardhaman
Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). By Manual Means With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)