Loading…
Loading…
10,663 results • Best match
Balarampur Bagmundi road, From 10.00 Kmp to 15.00 Kmp, Maintenance and repair work including crack sealing etc in stretches under Purulia Highway Division in the District of Purulia.
Crack Prevention Courses: Stress Absorbing Membrane (SAM) crack width less than 6 mm. Providing and laying of a Stress Absorbing Membrane over a cracked road surface, with crack width below 6 mm after cleaning with a mechanical broom, using modified binder complying with clause 517, sprayed at the rate of 9 kg per 10 sqm and spreading 5.6 mm crushed stone aggregates @ 0.11 cum per 10 sqm with hydraulic chip spreader, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
10.CC road drain construction work from main road to Hadda Rohdi Goluwala
steel work welded in built up sections/ framed work including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer using structural steel ect.as required.in gratings,brackets,gates and similar works.
GENERAL Sabarimala Festival Works 2025 26 Improvements by providing BM BC to Adoor Pattazhi road at ch 0 00 to 2 900 General Civil Work General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Construction / Upgradation of Road/ CD works including maintenance for Five Year after construction. RBR-Bridges
Road/Bridge Work
Road construction work from Chandresal Manasgaon to Notana
Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle
Strengthening work of Shivpur Talkesri road under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 220.25 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Strengthening work of Shivpur Talkesri road under P.W.D. Sub Dn. Narmadapuram. 1st Call, PAC Rs. 220.25 Lacs on Road & Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.