Loading…
Loading…
11,010 results • Best match
Moulik Nidhi Construction of C.C. Road Work at aajad Nagar Gali no. 02 Girls School ke Samne IIT Institute wali Gali , ward No. 25. Zone 08 File No. 263/26X3/6.2nd Call
Providing and Laying Cement Concrete Grade M-20 with 20 mm graded crushed stone aggregate, mixing shall be in mechanical mixer, laying with paver compacting by use of pin, plate / screed vibrators including form work by strong steel girders fixed by spikes, separation membrane 125 micron thick, including cutting of joints @ 4 to 5 m interval and filling it with hot applied bituminous sealant (without dowel bars) (max. thickness 20 cm). 1x80x2x0.10 = 16
Road construction work using interlocking tiles in Zone-03, Ward No. 59 (Tajnagari Phase-02, Block F-01) specifically from Bablu house to Adil house and from Naeem house to Arsad house.
Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 Sr.No. 2)
(SH - Construction/ Repair of all components i.e Footpath, Drain, Central verge, MS Railling/Grill etc. of roads except Re-carpeting main carriageway under Sub Division SER-11, Division South East Road-1, PWD ) (Balance work).
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Annual Plan-KBP P No. 51/2026-27 PUTHARIYADUKKAM P A CROSS ROAD CONCRETE IN CHEMMANAD GP-General Civil Work
Road Construction
GENERAL-Reconstruction of Damaged culvert in Idukki Nalumukku road Ch at 10/800-2024 25-General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
AS PER RFP
CONSTRUCTION COST WITH 5 YEARS OF MAINTENANCE.