Loading…
Loading…
10,494 results • Best match
Genaral Work- Annual Plan- Pro.No- 91/2025-26- Kottarakkara Muncippalitty- AyanimooduPoikayil Road Rennovation in Division-12
Road Rennovation
STRENGTHENING WORK OF BORSALI-JHUNDAKHEDI TITODIKHEDA VIA MAKHAVAD ROAD LENGTH 5.50 KM UNDER SUB DIVISION SHUJALPUR
STRENGTHENING WORK OF BORSALI-JHUNDAKHEDI TITODIKHEDA VIA MAKHAVAD ROAD LENGTH 5.50 KM UNDER SUB DIVISION SHUJALPUR
P/F Ladi and Beautification work Near Kandil Baba Chawl, Gaondevi, Pipe Line Road, Santacruz (E)
P/F Ladi & Beautification work Near Kandil Baba Chawl, Gaondevi, Pipe Line Road, Santacruz (E)
Improvement of hmp thrugh damage road work from nirala nagar malikpuram Under Ward-07 Zone-5
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soll as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil.
Janpad sre me sre to nagal road ke chainage 17.100 se 30.100 ta pole shifting work
Extra for Stay at Road Location
A/mtc of Road in Sector-64, Faridabad. Providing and Laying of GSB, WMM, DBM, BC, Tack Coat for new road near Hno. 1734 in Sector-64, Faridabad and all other works contingent thereto.
[17.30.2]Dense Graded Bituminous Macadam with Batch Type HMP 2. Dense Graded Bituminous Macadam 50 mm to 75 mm thickness (Grading II) Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications Note-If bitumen required is more than 4.5% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work.