Loading…
Loading…
10,505 results • Best match
GENERAL Premonsoon work 2026 27 Providing minor repairs clearing blocked up culverts cutting down branches of trees clearing jungle side drains in 10 roads 63 05 km under Road Section Pampady Pre monsoon Pre Mansoon work General Civil Work
Premonsoon Work
Additional work for repairing of FHTC, sprout at Baliapur,Road crossing at Angaria and allied repairing work within Baliapur and adjacent area under RCFA Division-I PHE Dte.
Additional work for repairing of FHTC, sprout at Baliapur,Road crossing at Angaria and allied repairing work within Baliapur and adjacent area under RCFA Division-I PHE Dte. (Including 18% GST & 1% Cess)
GENERAL-GENERAL-DEPOSIT-Urgent R e s t o r a t i o n w o r k s i n K u n n e l m u k k u - Puthensanketham road, Chavara-Pattakadavu road, Padappanal-Pulimoottilkadav road in Chavara LAC-Restoration work-General Civil Work
Restoration work
Dedicated Pipe laying for better Functionality and Providing Balance FHTC, Construction of Approach Road, Land development and allied work for PARAHAR Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte, Govt. of Wes
Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in roof slab including supply of 150mmx150mm C.I. surface box embedded into RCC cover slab all complete including cost of labour & materials.
Dedicated Pipe laying for better Functionality and Providing Balance FHTC, Construction of Approach Road, Land development and allied work for DAHIL Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte. Govt. of West
Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in roof slab including supply of 150mmx150mm C.I. surface box embedded into RCC cover slab all complete including cost of labour & materials.
Dedicated Pipe laying for better Functionality and Providing Balance FHTC, Construction of Approach Road, Land development and allied work for DILALBATI Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte, Govt. of Wes
Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in roof slab including supply of 150mmx150mm C.I. surface box embedded into RCC cover slab all complete including cost of labour & materials.