Loading…
Loading…
10,505 results • Best match
Patch-Pot Holes repair work on Different SH-MDR-ODR Road in block Puredalai in Distt Barabanki
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (For Road Patri)
Patch-Pot Holes repair work on Different SH-MDR-ODR Road in block Dariyabad in Distt Barabanki
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (For Road Patri)
B.T. Renewal work Harlay Nuniyahedi Ranjitpura road Ch. 00 to 2400 and Ch. 3790 to Ch. 7120 length 5.73 km PAC 120.65 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
B.T. Renewal work Harlay Nuniyahedi Ranjitpura road Ch. 00 to 2400 and Ch. 3790 to Ch. 7120 length 5.73 km PAC 120.65 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
Traffic survey, Details Soil investigation, topographical survey an Preparation of Detailed Project Report (DPR) for Widening and Strengthening work of Link road to Niramoy T.B Sanitorium from 0.00 to 1.20km and Sahapur-Dubrajpur Road, 5.80km to 10.8
Traffic survey, Details Soil investigation, topographical survey & Preparation of Detailed Project Report (DPR) for Widening & Strengthening work of Link road to Niramoy T.B Sanitorium from 0.00 to 1.20 km and Sahapur-Dubrajpur Road, 5.80km to 10.80 km under Birbhum Highway Division No-II, in the district of Birbhum in the year 2026-2027. Scope of work-1.Conducting 7 days- 24 hours (24 x 7) traffic survey by ATCC at 01 location. 2.Details Soil investigation (Test must be done from NABL accreditation Lab). 3. Conducting topographical survey . 4. Conducting Axle load survey at 01 location. 5.Assessment of existing pavement layers of the road by making pits of suitable dimension @ 2 nos/ KM (zigzag way) . 7.Making still and video photographs of the road showing the present condition of the road . 8.Conducting condition survey of all existing cross drainage structures with Photography . 9. Conducting survey for utiliti shifting details. 10. Details survey of Protective work and road side drainage system as where required. 11.Carrying out pavement design as per relevant IRC codes . 12.Preparation of detailed estimate . 13.Submission of complete DPR along with along with relevent data of the proposed work in 6( six) copies (Both Hard & Soft) and PPT also .
Modernization of various Rural Link Road (from Earth Work upto Premix Carpet including constn. of culverts,Drains,Ret.Walls and road furnituresafety measures under 555 Cr Project Distt Gurdaspur MC Batala Group No-2
Modernization of various Rural Link Road (from Earth Work upto Premix Carpet including constn. of culverts,Drains,Ret.Walls and road furniture/safety measures ) under 555 Cr Project Distt Gurdaspur MC BATALA Group No-2 (Work Code:-GDP-2026-057)
Legacy work management solution for Sutrapada nagarpalika by Bio-remediation and Bio-mining process at Veraval – Kodinar highway