Loading…
Loading…
10,505 results • Best match
Repair work of power channel road from MES bridge to fore bay and link road up to Fagpur gate by means of premix carpet and bituminous macadam
Providing and fixing Solar Powered Road Studs (Rectangular) of size not less than 100mm x 100 mm x 10 mm or (Circular) of dia 130+/- 6mm and height 30 +/- 2mm (with 8 super bright LEDs for long visibility from distance greater than 800 m) having twin shank and body made of aluminium alloy and poly carbonate material which shall be absolutely weather resistant and strong enough to support a load of 13635 kg tested in accordance with ASTM D 4280 and water resistance as per IP 65 in accordance with IS 12063:1987, fixed to the road surface using adhesives and the procedure recommended by the manufacturer as per Clause No. 804.6 and 804.7 of MORTH specifications.
Modernization of various Rural Link Road (from Earth Work upto Premix Carpet including constn. of culverts,Drains,Ret.Walls and road furniture/safety measures ) under 555 Cr Project Distt Gurdaspur MC BATALA G-3
Modernization of various Rural Link Road (from Earth Work upto Premix Carpet including constn. of culverts,Drains,Ret.Walls and road furniture/safety measures ) under 555 Cr Project Distt Gurdaspur MC BATALA Group No-3 (Work Code:-GDP-2026-061)
Modernization of various Rural Link Road (from Earth Work upto Premix Carpet including constn. of culverts,Drains,Ret.Walls and road furniture/safety measures ) under 555 Cr Project Distt Gurdaspur MC BATALA G-4
Modernization of various Rural Link Road (from Earth Work upto Premix Carpet including constn. of culverts,Drains,Ret.Walls and road furniture/safety measures ) under 555 Cr Project Distt Gurdaspur MC BATALA Group No-4 (Work Code:-GDP-2026-062)
Outsourcing of Labour Part of LT/HT Network Safety Compliance and System strengthening Project by upgrading the LT/HT distribution infrastructure to ensure full compliance with statutory safety clearances as mandated by relevant electrical safety
Outsourcing of Labour Part for replacement of low-lying PVC at road crossings with 4-core cables and re-locations of MCB’s., maintain line symmetry and proper ground clearance, replace existing 8-meter PCC poles with 9-meter PCC poles, replace 1/1 MCB near road crossings with 4/1 MCB to reduce congestion of PVC cables & replacement of multiple 4 core road crossing cables with single higher size 4 core cables, any other labour work related to provide better electrical clearance.
Work of CC road and drain work from Adarsh Vermas residence in Budhanagar Hans Kheda, Para under Haiderganj Third Ward to Tara Singhs residence via Arvind Vermas house.
Trimix for cc Road etc all comp.
Special Strengthening work on Sapat to Tharver Road Length 3.30 km. under sub division Barwah. (5th Call)
Special Strengthening work on Sapat to Tharver Road Length 3.30 km. under sub division Barwah. (5th call)