Loading…
Loading…
10,476 results • Best match
Work of widening and strengthening of Mustafa Road located next to the Parimal Vihar Housing Scheme of the Authority.
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres (DSR 16.1/2023)
Some urgent modification of electrical installation works at Boys Hostel in the campus of Sidho Kanho Birsha University Ranchi Road Purulia in the District of Purulia
Resurfacing of Galodar Sasan Road S.H.100 A Km. 0.00 To 31.50 Ta. Maliya Hatina Dist. Junagadh Work Under Section of Km 0.00 to 25.00 CRF Work 3rd Attempt
Supplying and stacking side shoulder of Murrum on road site including collection of material spreading, rolling of watering etc. complete as directed.
Cleaning of storm water drain and cross drain works including cleaning of road side shoulder etc. for the PWD Roads in Diu District.(Pre-monsoon activities) (4th Call)
Providing of labours for cleaning of road surface/road side shoulder upto RoW including cutting of Grass/Vegetation with tools etc. complete as directed by Engineer-in-charge. (a) Un-Skilled
ITEM RATE TENDER FOR ROAD RESURFACING WORK OF EXISTING DAMAGED ASPHALT AND R. C. C. ROAD IN VARIOUS AREA DUE TO HEAVY RAINFALL AT DAHOD NAGARPALIKA, DAHOD UNDER: ROAD RESURFACING GRANT (YEAR: 2026-27).
Road safety improvement work by restoration of damaged carriageway (Ch. 29.00 to 30.00 Km) and installation of traffic calming measures (Ch. 18.20 to 27.00 km) on Malda-Manikchak-Ratua-Samsi Road (SH-10) in different stretches in the Dist. of Malda.
Providing and laying dense bituminous macadam with Hot Mix Plant producing an average output of 75 tonnes per hour using coarse aggregate, fine aggregate, filler and bituminous binder as per design Job Mix Formula conforming Marshall Method as per specification, including screening, cleaning of chips and preparing a uniform and quality mix in Hot Mix Plant and ensuring a homogeneous mix, in which all particles of the mineral aggregates are coated uniformly, transporting the hot mix to work site, laying the mixed materials at specified laying temperature with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled, vibratory and tandem rollers for break down, inter-mediate and finished rolling to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, hand packing and pinning to give an even surface including cost and carriage of bitumen, coarse and fine aggregates and filler materials and hire charges of machinery and equipment for construction and quality control, fuels and lubricants and wages of operational staff complete as per Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).