Loading…
Loading…
10,478 results • Best match
Plantation work on Bhinder Ramgarh via Fatehnagar Gangapu Raipur Kareda Road SH-75 km 30/0 to 34/0
AMRUT-Retarring of kaattumaachaal road 0/000 to 0/337 (ward 22)-Sl.No. 33 Elayavoor zonal-General Civil Work
3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
2230737-26-MLA-SDF-AMBEDKKAR ROAD TARRING WITH BMBC REACH 2 IN 37,38 KOCHI CORPORATION-KMC-General Civil Work
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
Preparatory measures for various roads in SectionI ahead of the upcoming monsoon including brick stitching jhama metal consolidation and allied works under Quality Control Sub Division NO I of Nadia Highway Division No II for the year 2026 2027
Krishnagar-Hanskhali Road (6.00km to 8.00 km)
Preparatory measures for various roads in SectionIII ahead of the upcoming monsoon including brick stitching jhama metal consolidation and allied works under Quality Control Sub Division No I of Nadia Highway Division No II for the year 2026 2027
Nokari - Aishmali Road (11.00 km to 12.00 km)
Special Repair Of 2 Nos .Link Roads In Kalayat Constituency Group No-1, (Work Plan 2026-27) Road Id -267 And 295
Special Repair Of 2 No`S Link Roads In Kalayat Constituency Group No-1, (Work Plan 2026-27) Road Id`S -267 And 295