Loading…
Loading…
10,425 results • Best match
Re Tender LAC ADS 2024 25 Cherthala Municipality ward 24 st martin karuva school road renovation general civil work
Retarring road
LAC-ADS-MLA ADS 2025-26-VATTAKKULAM KADALAYI NADA ROAD MACCADAM TARRING EDAKKAD ZONAL KANNUR CORPORATION-General Civil Work
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
MP-LADS-MPLADS 2025-26-Bathamukku Munambath Palli road Tarring-Division 34-Edakkad Zonal-Kannur Corporation-General Civil Work
OD479135/2025-2026:Fixing Plaque for MPLADS / MLA ADS works: Stone tile (polished) work for wall lining over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and cement slurry @ 3.3 kg/sqm including pointing in white cement complete. Granite of any colour and shade
Supply and Stacking of stone aggregate and coarse sand/Stone dust at HMP location on Confluence-HAA road for Resurfacing work on HAA-PARO Road (Part-I), on Damchu-Chukha Road(Part-II) and on stacking of stone aggregate at Wangkha P-T Road (Part-III)
GENERAL Premonsoon work 2026 27 Providing minor repairs clearing blocked up culverts cutting down branches of trees clearing jungle side drains in 16 roads 63 22 km under road section Ettumanoor Premonsoon General Civil Work
Premonsoon Work
Chakulia (Pathati more) - Majhlishpur Road (VR) from 0.00 kmp to 13.40 kmp, - Strengthening work under Uttar Dinajpur Division, P.W.D. in the district of Uttar Dinajpur under RIDF-XXXI.
Construction of Sub Base using Local Materials :- Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For Construction of Sub Base by compacting river bed materials For 1 Cum compacted volume using 1.28 cum River Bed materials