Loading…
Loading…
10,459 results • Best match
Construction of Control Room Building, Foundations, Cable Trench, Compound Wall, RCC Road etc at 66 KV Ghodisimel ss and 02 Nos of Opposite end feeder bay along with misc. other work at 132 KV Tilakwada ss Ta Naswadi, Dist Chhotaudepur under Jambuva Circle
Hariparvat Zone (Room No. 87) Road improvement work using hot-mix asphalt from Naveen General Store on the main road (near Saryudham, Karmayogi Enclave) to the house of Shri Amit Parashar.
Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 Sr.No. 2)
FABRICATION OF MS STRUCTURE WITH COVER PLATE FOR THE VALVE CHAMBER OF 900 MM DIA SS GRID WITH OTHER ALLIED WORKS AT JANANAYAK HEMANTA BASU MARKET ON TARATALA ROAD.
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & (6)-1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete Including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816-1969 & IS: 1995 using electrodes of approved make and brand conforming to JS:814-2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not loss than 22.5 Kg./m. or 15% of weight for finished structal members weighing less than 22.5 Kg./m. may be Increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rales are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg/m
Works including door-to-door (residential and commercial) garbage collection and segregation, road and drain cleaning, and community sanitation complex cleaning in all villages of the Gram Panchayat BAGARIYAWAS
Works including door-to-door (residential and commercial) garbage collection and segregation, road and drain cleaning, and community sanitation complex cleaning in all villages of the Gram Panchayat BAGARIYAWAS
Works including door-to-door (residential and commercial) garbage collection and segregation, road and drain cleaning, and community sanitation complex cleaning in all villages of the Gram Panchayat JHARLI
Works including door-to-door (residential and commercial) garbage collection and segregation, road and drain cleaning, and community sanitation complex cleaning in all villages of the Gram Panchayat JHARLI
Works including door-to-door (residential and commercial) garbage collection and segregation, road and drain cleaning, and community sanitation complex cleaning in all villages of the Gram Panchayat KANCHANPUR
Works including door-to-door (residential and commercial) garbage collection and segregation, road and drain cleaning, and community sanitation complex cleaning in all villages of the Gram Panchayat KANCHANPUR