Loading…
Loading…
10,759 results • Best match
Chuva Khanpur Road. Km.0/00 to 5/400. (Proposed Work: Constructing New Box Culvert, Retaining Wall and Other Misc. Works at Km.0/200)
Construction work of C.C. Road at ward no 23 main road arjundas shop to durga shop and manoj kushwah house vidisha
Construction work of C.C. Road at ward no 23 main road arjundas shop to durga shop and manoj kushwah house vidisha
Annual Rate of Construction Work of All Type Building Work and C.C, R.C.C. Road and WBM With Paving Block Road Repairing and New Work of Savarkundla Municipality (Year–2025-26) (One Work Will Have To Be Done Up To A Limit Of Rs. 5.00 Lakh) And Road ... Grant Road Work ... Road Work (This ... (This Work Amount ...
base for road work including removing the excavated stuff and
Bongaon Jhowdanga Panchpota Road from Ch. 11.200 Km to Ch. 14.200 Km, Emergent Patch repairing and Mending Potholes work in stretches under Bongaon Highway sub division of Barasat Highway Division No. II, Govt. of West Bengal in the District of No
Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For WBM / WMM Surface: Applying tack coat with Cationic Bitumen Emulsion (Packed)@ 0.50kg/m2
Zone contract (Road work) Zone 8:- Repair to Road works in all colonies and service buildings at JU in the section of ADEN/HQ/JU for Year Year 2026-27 & 2027- 28
Construction work of CC Road and Drain from approach road to dhobiyan kabristan in ward 04 mohalla jheel colony
Construction work of CC Road and Drain from approach road to dhobiyan kabristan in ward 04 mohalla jheel colony (with GST)