Loading…
Loading…
10,507 results • Best match
RECONSTRUCTION WORK OF RAMGAON-DHOBIYA LINK ROAD UNDER CRITICAL GAP SCHEME IN DISTRICT BAHRAICH FINANCIAL YEAR 2026-27 VIDHAN SABHA-MATERA
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days including Trimixing by floating method & adding hardener in required quantity and depth upto 5 cm complete as per directions of Engineer-In-charge to meet Tenchinal specifications.
Improvement and asphalting work of Chhadandev Nwali motor road in Didihat Constituency of district Pithoragarh, under Honble CM announcement No. 364/2024.
Hill side defect cutting for making roadway as per prescribed plan and longitudinal section drawing and as required at site in all types of soils and rocks whatever met at site for making the road width and gradient as per prescribed plan including all lead lift & disposal of surplus excavated material as per direction of Engineer-in-charge also inclduing supply of all material labour T&P etc. required for proper completion of the work
C/O WORK OF CC ROAD AND DRAIN FROM RIYAJ BETHAK TO H/O YAQOOB IN WARD NO 13 MOH-MUMTAAZ HUSSAIN
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, Using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Renovation and Repairing work for occupied flat no I_2 I_4 and J_6 at RHE 84 Ibrahimpur Road Govt Housing Jadavpur Kolkata 700032
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor.3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement (ii) 25 mm. thick
C/O WORK OF CC ROAD AND DRAIN FROM H/O HAJI SHAMIM TO SHOP OF ISMAIL WARD NO 25 MOH-NEJOSARAY
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, Using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
C/O WORK OF CC ROAD AND DRAIN FROM S/O ISMAIL TURK TO KABRISTAN GATE IN WARD NO 02 MOH-BEGAMSARAY
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, Using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501