Loading…
Loading…
10,527 results • Best match
Refer to BOQ
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) & for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil
W-25 CC ROAD WITH CC DRAIN WORK UDYOG OFFICE BOUNDRY TO BAL MUKUND AND NATHU RATHORE LAL BAHADUR SHASTRI SCHOOL WALI GALI
construction work
Road improvement work by hot mix plant from Akhileshwar Temple to Central Park Gate No. 1 under Zone-6 Ward 91 Shastri Nagar.
Providing and applying 2.5 mm thick road marking strips (retro-reflective) of specified shade / colour using hot thermoplastic material by fully / semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-incharge and accordance with applicable specifications.
Improvement of hmp through road work from bankey bihari dharmkata to No.-3 crossing via pandit dugd bhandar Under Ward-06 Zone-5
Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including getting out
ANNUAL PLAN PUNALUR MUNICIPALITY PROJ NO. 97/2026-27 RENOVATION OF KALLAR PUTHENVEEDU JUNCTION TO PATHEKKAR KALLAR ROAD-PUNALUR MUNICIPALITY-General Civil Work
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
LAC ADS MLA ADS 2025 26 Arayalmuk Kakkakunnu road tarring and side concrete in Sooranad South GP in Kunnathur LAC General Civil Work
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means