Loading…
Loading…
10,546 results • Best match
Providing LT & HT line Shifting & Electrification work in Raigarh-Kotra-Nandeli 5 KM, 4 Lane road under Sub-Division Raigarh Distt. Raigarh (C.G.)
Providing LT & HT line Shifting & Electrification work in Raigarh-Loing-Mahapalli 5 KM, 4 Lane road under Sub-Division Raigarh Distt. Raigarh (C.G.)
Ward No. 12 Mohalla Mori Gate Mein Camp Office Shri Chandrapal Singh Ji (M.L.A Debai ) se Malapur Road tak Interlocking Foothpath Nirmanh Work
E/W in filling with 8th km cartage including of Royallity all work complete.
AMRUT-Retarring arayalthara yatheemkhana road Ch 0 415 to ch 0 497 ( from yatheemkhana) (ward 12)-Sl.No. 13 Puzhathi zonal-General Civil Work
4.1.A.2:Granular Sub-base with Well Graded Material (Table 400.1)(A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material
M/ Up/W of various Rural Link Road BHAGWANPUR TO DNG CHOUNTA ROAD VIA SADANA RASULPUR PACHOWAL JHAROLI (from Earth Work upto PC including constn. of culverts,Drains,RW and road furniture/safety measures ) under 555 Cr Project Distt GSP MC DNG G-2
Modernization Upgradation/Widening of various Rural Link Road BHAGWANPUR TO DINANAGAR CHOUNTA ROAD VIA SADANA RASULPUR PACHOWAL JHAROLI (from Earth Work upto Premix Carpet including constn. of culverts,Drains,Ret.Walls and road furniture/safety measures ) under 555 Cr Project Distt Gurdaspur MC DNG G-2 (Work Code:-GDP-2026-056)
Improvement work on public roads under the State Plan in the Lalkuan Assembly constituency of Nainital district specifically the road near the homes of Manish Loshali and others in Fattabangar the road near the homes of Narayan Dutt Kabdwal Gaurav Ka
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.