Loading…
Loading…
10,616 results • Best match
Development works in unauthorized colonies. C/o Road and S.W drain at Sarup NAGAR Extn. W,X,Y,Z Block Ph-II East Village Libaspur Part-6 in Badli AC-05 (Regn.no.904).
Providing and laying in position ready mixed M-10 plain cement concrete, (With 20MM Nominal Size Stone agg.) with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having ontinuous agitated mixer,manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, finishing, curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability; excluding the cost of centering & shuttering; complete as per direction of the Engineer - in - charge. works up to plinth level (cement content considered @ 220kg/cum
Development works in unauthorized colonies. C/o Road and S.W drain at Sarup NAGAR Extn. W,X,Y,Z Block Ph-II East Village Libaspur Part-7 in Badli AC-05 (Regn.no.904).
Providing and laying in position ready mixed M-10 plain cement concrete, (With 20MM Nominal Size Stone agg.) with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having ontinuous agitated mixer,manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, finishing, curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability; excluding the cost of centering & shuttering; complete as per direction of the Engineer - in - charge. works up to plinth level (cement content considered @ 220kg/cum
Erection of Strong Barricading with Allied Works on different stretches of road for different programmes of Govt. of West Bengal and movement of VVIPs during the year 2026 2027 Surrounding area of Central East Kolkata
Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in-charge. (Note: This work should not be executed without specific permission of Superintending Engineer) (a) 100 mm. dia bamboo railing and 150 mm. dia. Jhaubullah/Eucalyptus/other approved timber post @ 1.80 m. apart. (i) Railing 4 rows on each leg and one at pivot point
Erection of Strong Barricading with Allied Works on different stretches of road for different programmes of Govt. of West Bengal and movement of VVIPs during the year 2026 2027 Surrounding area of South West Kolkata
Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in-charge. (Note: This work should not be executed without specific permission of Superintending Engineer) (a) 100 mm. dia bamboo railing and 150 mm. dia. Jhaubullah/Eucalyptus/other approved timber post @ 1.80 m. apart. (i) Railing 4 rows on each leg and one at pivot point
Erection of Strong Barricading with Allied Works on different stretches of road for different programmes of Govt. of West Bengal and movement of VVIPs during the year 2026 2027 Surrounding area of South East Kolkata
Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in-charge. (Note: This work should not be executed without specific permission of Superintending Engineer) (a) 100 mm. dia bamboo railing and 150 mm. dia. Jhaubullah/Eucalyptus/other approved timber post @ 1.80 m. apart. (i) Railing 4 rows on each leg and one at pivot point
Erection of Strong Barricading with Allied Works on different stretches of road for different programmes of Govt. of West Bengal and movement of VVIPs during the year 2026 2027 Surrounding area of North West Kolkata
Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in-charge. (Note: This work should not be executed without specific permission of Superintending Engineer) (a) 100 mm. dia bamboo railing and 150 mm. dia. Jhaubullah/Eucalyptus/other approved timber post @ 1.80 m. apart. (i) Railing 4 rows on each leg and one at pivot point