Construction work of road by C.C. from H.No.-98/152 to 98/166 Adhda Pahalwan ka akhara via Nizam Kulfi shop n from H.No. 97/138 Nasim kabab shop to 97/289 Yakub halwai, and from H.No.-97/199 to H.No.-97/213 via 97/197 Kamran house under ward-108 Zon
Raising manhole by dismantling & refixing of manhole cover & frame mcluding dumantling C.C and C.C. work in 1:2:4 but excluding brick work which taken separately and all completion of work.
B.T. RENEWAL WORK OF SEMALKHEDI APPROCH ROAD LENGTH 3.30 KM AND KHELAGAON TO GURDADIYADEV LENGTH 2.70 KM TOTAL LENGTH 6.00 KM SUB DIVISION SUSNER DISTT AGAR MALWA
B.T. RENEWAL WORK OF SEMALKHEDI APPROCH ROAD LENGTH 3.30 KM AND KHELAGAON TO GURDADIYADEV LENGTH 2.70 KM TOTAL LENGTH 6.00 KM SUB DIVISION SUSNER DISTT AGAR MALWA
AMRUT-Retarring from nanukada to neduppanvayal road ch 0 000 to 0 151(from transformer -sreepriya nivas) (ward 7)-Sl. No.4 Puzhathi zonal-General Civil Work
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
AMRUT-Retarring of chimminiyankavu samadarshini road(samadarshini complex nagar to parvathy house ch 0/000 to 0/349) -Div 28-Sl.No.41 Elayavoor zonal-General Civil Work
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
Annual Maintenance and House keeping, Tank & Fountain cleaning, providing plumber and Carpenter, repair to pump and pumping machineries and other allied works for the period 01.08.2026 to 31.07.2027 at Chief Secretary residence & Home Office, Palace ... Palace road ,
Engaging Unskilled (light work)works to be carried out as per the direction of the engineer in charge of the work
C/O WORK OF CC ROAD AND DRAIN FROM H/O MUKEEB KHAN SURI TO BETHAK OF MUKEEB KHAN SURI IN WARD NO 17 MOH-GAUHAR ALI KHAN
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, Using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501