Loading…
Loading…
10,487 results • Best match
Work of laying 160 m Daya DI K-7 drinking water pipeline in a length of 400 m from Dankor road front in BBC School chaudhry cold store
Providing and fixing Barricading at site of work for restricting the general public using 40 mm dia M.S. pipe ("B" class) as vertical post with average spacing of 1.80 meter between two vertical posts, having height at least 1.5 m above road/ ground level and at least 30-45 cm below road/ ground level by making suitable size hole in road/ ground, providing and fixing suitably two rows of 100 mm wide PVC Tape preferabley of red colour. The M.S. pipe shall be painted in red and white colour strips as per approved pattern as and when it becomes shabby but at least after every alternate shifting at new location. After shifting/ removal of barricading the hole shall be filled up properly and site is to be cleared in all respect. (Note: measurement is to be done in linear basis). RUIDP SOR Item 4.28
Work of laying 160 m Daya DI K-7 drinking water pipeline in a length of 400 m from Dankor road front in BBC School chaudhry cold store
Providing and fixing Barricading at site of work for restricting the general public using 40 mm dia M.S. pipe ("B" class) as vertical post with average spacing of 1.80 meter between two vertical posts, having height at least 1.5 m above road/ ground level and at least 30-45 cm below road/ ground level by making suitable size hole in road/ ground, providing and fixing suitably two rows of 100 mm wide PVC Tape preferabley of red colour. The M.S. pipe shall be painted in red and white colour strips as per approved pattern as and when it becomes shabby but at least after every alternate shifting at new location. After shifting/ removal of barricading the hole shall be filled up properly and site is to be cleared in all respect. (Note: measurement is to be done in linear basis). RUIDP SOR Item 4.28
Work of laying 110 m Daya PVC drinking water pipeline in a length of 400 m from Idreesh Colony main gate to Jaheer Ahmad Ward 14 Gulavthi Road.
Providing and fixing Barricading at site of work for restricting the general public using 40 mm dia M.S. pipe ("B" class) as vertical post with average spacing of 1.80 meter between two vertical posts, having height at least 1.5 m above road/ ground level and at least 30-45 cm below road/ ground level by making suitable size hole in road/ ground, providing and fixing suitably two rows of 100 mm wide PVC Tape preferabley of red colour. The M.S. pipe shall be painted in red and white colour strips as per approved pattern as and when it becomes shabby but at least after every alternate shifting at new location. After shifting/ removal of barricading the hole shall be filled up properly and site is to be cleared in all respect. (Note: measurement is to be done in linear basis). RUIDP SOR Item 4.28
DEPOSIT WORK FOR SHIFTING 33 KV 11 KV and LT POLES FOR ROAD WIDENING FROM CHUNGAM TO VENGA INFAVOUR OF EXECUTIVE EBGINEER,KRFB,PALAKKAD UNDER ELECTRICAL SECTION,KUMARAMPUTHUR
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
A/R and M/O in buildings under Education wing Division during 2026-27. SH Distempering and painting work in Atal Adarsh Vidyalya Babar Road under Education wing.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work.
Work including collection and segregation of garbage from households and commercial establishments, road and drain cleaning and community sanitation premises cleaning in all the villages of Gram Panchayat Gathwari.
Work including collection and segregation of garbage from households and commercial establishments, road and drain cleaning and community sanitation premises cleaning in all the villages of Gram Panchayat Gathwari.