Loading…
Loading…
10,494 results • Best match
Plantation work on Jogras to Pansal (Raipur Suwana) Part Bhilwara to Devgarh via Pansal Pithas Bagore Raipur Borana Jagdish Road upto Distt. Border km. 74/0 to 82/0
Interlocking work of RCC drain, CC road and side track from Nagendra singh house to dinesh singh house via rajkishore singh house in Ekta Nagar under Shardanagar Seceond Ward.
M.S. iron work in R.C.C. work etc all comp.
Comprehensive Maintenance of various roads, under Sub-Div-5/South West Road Division-1 PWD, New Delhi during 2025-26 and 2026-27 SH Repairing of Footpaths, Central Verge, drain and berm portion and other misc. repair works within the right of way
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Zone-1, Chhatta, Room No. 32 Located on Kalindi Vihar 100-foot Road, on the route towards Shahdara, opposite R.B. Degree College work regarding the laying of an underground pipeline.
Providing and Iaying NP-3 pipe RCC concrete pipe for culvert on first class in slngle row including fixing socket with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2900. (1200mm dia). (Chapter No.20 Si.No.10 (e))
(I) Electrical work in c/w "Provision of crossing station at PANJWARA ROAD HALT Halt station in between BARAHAT-MANDARHILL Section." (II) Electrical work in c/w "Provision of crossing station at GANGWARA Halt station in between HANSDIHA- PYHT ... Electrical work in ... Electrical work in ...
the road, footpath, rail track etc. As per required
Construction of Chulhapathra to Kariyatola Road Length 3.10 K.M. (Working Length 1.92 km) including Bridges & culverts at Distt.- Balod (C.G.) (CC Road)
Construction of RCC open drain Construction of RCC open drain 1.0m x 1.0m inside dimension lined with 150 mm thick RCC M-20 walls, 150 mm thick CC M-20 foundation, over 100 mm thick (Av) leveling course in PCC M-15 including excavation , dressing of sides and bottom, provision of HYSD reinforcement consisting 10 mm dia horizontal bars @ 150 mm c/c and L-shaped 10 mm dia vertical bars @ 150 mm c/c (L=1400 mm) including cutting, bending and binding wire, placing in position, providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications.