Loading…
Loading…
10,523 results • Best match
STRENGTHING WORK OF Kalyanpur-Latori-Datima-Salka road (MDR) in Dist. Surajpur (C.G.) from Km. 1 to 7, 10/2-4, 11 to 12/8, 13/4 to 13/10, 16/2-4, 17/6 to 20/4, 21/2-4-6, 23/8 to 30/4, 36 to 38, 40/10 to 41, 47 to 49 = 29.00 k.m. (Work code – W31654)
Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia complying to IS:458, across the road (new construction), extending from drain to drain in cuts and toe of slopes to toe of slopes in fills, excluding constructing head walls at ends, providing a fill of granular material over top and sides of RCC pipes,n bedded on a 0.3 m thick layer of granular material free of rock pieces , outer to outer distance of pipes at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts , joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 and approved drawings. (A) NP-3 Pipe (i) Single row for one utility service 300 mm dia
Construction of BT road PWD Road Hatapada to Satyabadipur Road for the year 2026-27
Construction of Granular Sub Base Grading III material as per table 400-1 spreading in uniform layers with moto grader on prepared surface, mixing by mix in place method with rotavator at OMC & compacting with vibrator roller to achieve the desired density complete as per clause 401 of Mo SRT&H specifications for Road & Bridge works ( 4th revision) (Close Graded)
Construction of road and drain from Srivastav House to Sakir house in ward no 08 MC Sohna
Construction of road and drain from Srivastav House to Sakir house in ward no 08 MC Sohna (1 Job Work)
Heightening of tower in existing 110KV Bagalkote to Kaladagi SC line between Loc No.57-58 to maintain ground clearance for public safety b/w Kaladagi to Kainakatti road in TLM Section KPTCL Bagalkote including supply of materials/ equipments, ... civil works , ...
1.2 Total value of works executed (KPTCL & NON KPTCL works) and payments received in the last five years (in Rs. Lakhs) of Bidder Financial Year KPTCL works Non KPTCL works
B.T. RENEWAL WORK IN DIFFERENT ROADS UNDER P.W.D SUB DIVISION KHURAI LANGTH 14.90 KM PAC 336.65 LAKH (GROUP-II) ( II - CALL ) 1. BADE THAKUR BABA TO CHHOTE THAKUR BABA MAGRA TO CHANDRAPUR ROAD LENGTH 7.00 KM PAC 148.67 LAKH 2.TALAPAR TO DUGAHA KAL
B.T. RENEWAL WORK IN DIFFERENT ROADS UNDER P.W.D SUB DIVISION KHURAI LANGTH 14.90 KM PAC 336.65 LAKH (GROUP-II) ( II Call) 1. BADE THAKUR BABA TO CHHOTE THAKUR BABA MAGRA TO CHANDRAPUR ROAD LENGTH 7.00 KM PAC 148.67 LAKH 2.TALAPAR TO DUGAHA KALAN ROAD LENGTH 2.40 KM PAC 51.31 LAKH 3. BAMHORI LAL TO CHARONDA ROAD LENGTH 2.50 KM PAC 53.41 LAKH 4. KHURAI RAJWANS ROAD LENGTH 3.00 KM (BT over CC) PAC 83.26 LAKH
Construction of CC Road at ward 20 Motipura in Gupta Kirana Motipura Couhk to Nag mandir.
CC Road Work