Loading…
Loading…
10,550 results • Best match
NEW CONSTRUCTION OF PCC ROAD FROM SAYER TO MAIN ROAD AT PIRMA(109711208)
NEW CONSTRUCTION OF PCC ROAD FROM SAYER TO MAIN ROAD AT PIRMA(109711208)
R.D. Road to Mohanguda _Road_SDBC,Jungle cutting,Earth work in both side flanks, 600 mm dia Single row HPC 3 nos. and 1000 mm dia Single row HPC 3 nos. _0.000 to 6.700 At 0.450 km,1.320,2.200 km and At 0.170 km,1.110 km,3.200 km
Construction of embankment with approved materials obtained from borrow pits with all leads & lifts , transporting to site by mechanical means within a lead of 5KMs spreading, grading to required slope & compoacting to meet requirement of table 300-2 & Clause 305 of MOSTRH Specification for Roads & Bridge works (4th Revision )
Construction of HL bridge over Local Nallah on Melghara to Silet via Semikhal road in the district of Kalahandi under SBY for the Year 2024-25
Earthwork in excavation for bridge works in all kinds of soil, by mechanical means utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge.
KALPETTA BLOCK PANCHAYATH- MPLADS- CONSTRUCTION OF TRIBAL HOSTEL - MAKKUNI ROAD (CONCRETE) THARIODE GP
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Construction of H.L. bridge over Local Nallah on Badadangiani to Kholadangini road
Construction of granular sub-base by providing Close graded Granular subbase Grading-III material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (4th Revision)
Construction of Road from Bagroda to Pipaliya Kunjangarh Road Length 3.05 Km.
Construction of Road from Bagroda to Pipaliya Kunjangarh Road Length 3.05 Km. 1st Call P.A.C. 488.80 Lakh,as per Road & Bridge SOR wef 11-04-2025 Schedule Attached Complition period 300 Days