Loading…
Loading…
10,577 results • Best match
Construction of road from Rajgarh Hatta Chhaka to Bhandarikhula Chhak under Paunsia GP
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoRTH specifications for Road & Bridge works (4th revision) but excluding the charges of GST etc complete as per specification & direction of Engineer-in-Charge..
Construction of CC Road in Keshavganj Ward-Parshad Nidhi
Construction of CC Road in Keshavganj Ward-Parshad Nidhi
Construction of road from Marangtandi to Palasabani under Marangtandi GP
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge.
Electrical work in connection with elimination of level crossings No. 13 at Km 20/8- 9, LC-16 at Km 26/9-27/0, LC -19 at Km 36/0-1, 20 at Km 40/3-4, LC - 21 at Km 40/9-41/0, LC-23 at Km 43/3-4, LC-24 at Km 44/1-2 & 26 at Km 45/4-5 by providing road ... Development works at ...
Horizontal Direction Drilling/boring without damage of surface road using auger machine the bore
Construction of RD road to Gadabeda Road in the district of Koraput under MMSY for the year 2026-27
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MOSRT&H specifications for Road & Bridges work (4th Revision).
Construction of RD road to limbsiguda Road in the district of Koraput under MMSY for the year 2026-27
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MOSRT&H specifications for Road & Bridges work (4th Revision).