Loading…
Loading…
10,577 results • Best match
Construction of PCC Road Detail Estimate for Construction of PCC Road from Md. Shakil house (PCC Road) to Kalam Chowk at Ward no. 14.
Dry lean cement concrete sub-base (Construction of dry lean cement concrete sub-base over a prepared subgrade with coarse and fine aggregate... cement content not be less than 150 kg /m3 , OMC to be determined during trial length construction, concrete strength not be less than 10 Mpa at 7 days, mixed in batching plant, transported ...
Construction of CC Road and Drain in Kunthikaldoddi village, Hallimaranahalli Grampanchayath, Kanakapura taluk.
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
Construction of Internal C.C. Road at Bhikar Sarola Taluka and District Dharashiv
Item No.4:-Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . Addn.Spec.No.As directed by Engineer-in-charge (SSR 22-23 It.No.50.58)
CONSTRUCTION OF CC ROAD AND DRAIN AT UDHAV DAS MEHTA PARISAR WARD 29, Z-08
CONSTRUCTION OF CC ROAD AND DRAIN AT UDHAV DAS MEHTA PARISAR WARD 29, Z-08
Construction of CC road & drain from Hunasanahalli Mugguru main road to the Shanimahathma temple in Honniganahalli village, Bannimukodlu G.P, Kanakapura taluk.
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
Construction of Road and Culvert from Jodhgarh to Bhim Main Road
Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design,... and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing ...