Loading…
Loading…
11,576 results • Best match
Construction of Road work from the Sipah Saudi main road to Chachaipar Minor via Alapur. (Length- 1.65 km)
Earth work in cutting /filling in ordinary Soil lift 1.50m lead upto 30 m including ramming and dressing including all as per S.I. 253
Construction work of road from Magwa Road towards Madian Mata Temple in village Chhapachhaul of development block Mahroni.
Construction of embankment with approved material obtained from borrow pits with all lifts uo to 1.5 m, , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.1 and 300.2 with a lead up to 1000 m as per technical specification clause 301.5
Road work
Providing, laying, spreading and compacting I.R.C. Grade -II stone aggregates (of size 63mm to 45mm) confirming to sieve analysis as per specification and moorum of approved quality at work site away from trafficable berm free from weathered skin surface for road work in regular interval including conveying from stacks spreading metal and moorum for IRC grade-II metalling in even layers to an uniform thickness compacted to 75 mm required density as per clause 404 of MoSRT&H specification for Road & Bridge works (4th revision) and packing the voids with small stones and hand packing the same to the proper camber and grade filling the interstices by spreading moorum over the metal surface including watering turf edging and consolidation with PRR 8-10 Tonnes with sufficient number passes for each layer including hire and running charges of PRR and all other machineries and T&P required for the work cost of watering and carriage of water including cost,conveyance, royalty, DMF,EMF & additional charge and Cess with all leads, lifts, all labour etc. required for the work complete in all respect, but excluding GST as per specification and as per the direction of the Engineer-in-charge.
CONSTRUCTION OF CC ROAD WORK AT WARD 01 AND 17 RUNIPUR ROAD MS ROAD TO HOSTAL ROAD, WARD 18 MW OMI GAUD HOUSE TO SHRIWAS HOUSE, WARD 15 ME RAMNAGAR AS PER NIT MUNICIPAL COUNCIL JORA DIST MORENA
CONSTRUCTION OF CC ROAD WORK AT WARD 01 AND 17 RUNIPUR ROAD MS ROAD TO HOSTAL ROAD, WARD 18 MW OMI GAUD HOUSE TO SHRIWAS HOUSE, WARD 15 ME RAMNAGAR AS PER NIT MUNICIPAL COUNCIL JORA DIST MORENA
Kanupur - Bahutali Road from 7.00 kmp. to 9.00 km, patch repairing work under Murshidabad Highway Division-I, in the District of Murshidabad. during the year 2026-2027.
Construction of CC Road work at Various Places in ward no 20
Providing and laying Cement Concrete grade M-20 (Nominal mix 1:1.5:3) with 20 mm graded crushed stone aggregate, mixing shall be in mechanical mixer, laying with paver compacting by use of pin, plate / screed vibrators including form work by strong steel girders fixed by spikes, separation membrane 125 micron thick, i/c cutting of joints @ 4 to 5 m interval & filling it with hot applied bituminous sealant (without dowel bars). (max. thickness 20cm)