Loading…
Loading…
10,240 results • Best match
New Construction of Link Road Mehma Sarja Main Road to Sardar Harphool Singh Brar de Ghar Tak under DMF Funds
Compaction of earth work & Prepration of Sub grade including loosing,leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level camber,watering,rolling with road roller, compacting the bed to achieve minimun dry density as given in Table 300-2 as per technical clause 305 of MORT&H specifications (in case of link roads earth work to be done by villagers.) as per CSR 24.4(c)
Construction of New Road Dabal up to Talaviyanadi Gogaji Mandir
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and MoRTH Specification Clause 803
Construction of CC Road Around bade talab Ward No. 01
Construction of Road From Gokul ka Bas to upto Pipali
Construction of Embankment with Material Obtained from Roadway Cutting : Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3
Construction of Shops near Hospital in Palera road (IInd call)
Construction of Shops near Hospital in Palera road
Construction of Flexible Road at Por ramangamdi Notified area GIDC