Loading…
Loading…
11,076 results • Best match
Construction of Road and 5 years Routine Maintenance for Package No. AS14297
Cross Drainage Works Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material [SOR 25-26] [item No. 11.1]
Construction of Road and 5 years Routine Maintenance for Package No. AS24282
Cross Drainage Works Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material [SOR 25-26] [item No. 11.1]
Construction of CC Road at Haraparbati Nagar in Ward No.08, Nayagarh
Earth Work Cutting/ Levelling in hard soil or Gravely soil within 5km initial lead and 1.5mt initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30M in depth and as per direction of Engineer - In - Charge etc. complete
Construction of ward 15 b.k palace wali road se conn galiyo me vais cc road evam nali nirman
Construction of ward 15 b.k palace wali road se conn galiyo me vais cc road evam nali nirman
Re- Construction of Bridge at Ch 0.10 km of Gulur - Maraganakunte road in Bagepalli Taluk, Chickballapura District
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
Construction and Maintenance of RD Road to Raikasahi under MMSY Scheme in the district of Gajapati for the year 2026 2027
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared... and finished in continuous operation including provision of contraction and expansion, construction joints, primer, sealant, near approaches to bridge/culvert or at any approved portion of road and construction joints, admixtures as approved, curing of concrete slabs for 14-days as per MoRD including ...