Loading…
Loading…
11,649 results • Best match
CONSTRUCTION OF BRIDGE OVER RIVER BIRMA, APPROACH ROAD, ADDITIONAL APPROACH ROAD AND PROTECTION WORK ON GADAURA- KANORA MARG IN DISTT MAHOBA
Foundation Providing and Constructing Temporary Island 24 m diameter for Construction of Well Foundation for 8 m dia. Well.
Agra Inner Ring Road Phase I Remaining construction work on the service road on the left side near Bamroli Katara village
Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. DSR-2023 16.62
(EPC) MODE CONSTRUCTION OF BRIDGE OVER RIVER CONSTRUCTION OF BRIDGE OVER RIVER KUDAAR AT BHADRA-DHAYPURA ROAD APPROACH ROAD PROTECHTION WORK IN DISTT JHANSI
ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC) MODE CONSTRUCTION OF BRIDGE OVER RIVER CONSTRUCTION OF BRIDGE OVER RIVER KUDAAR AT BHADRA-DHAYPURA ROAD, APPROACH RAOAD & PROTECHTION WORK IN DISTT JHANSI. Total Length of Bridge 90.23 M
LAC ADS Construction of South Malipuram Mazjid Road in ward 17 of Elamkunnapuzha Gramma Panchayath work General Civil Work
Road, Drain & Culvert
Open e-tender for Repairs, maintenance & execution of all works including new works [ i.e. General work, Wood works, Water Pipeline, Road work and sanitary works] from Jamalpur to Kiul (excluding) and Diesel Shed for all service buildings, staff quarters, Circulating area, Platforms & Sheds etc. (including Diesel shed) under AEN/L/Jamalpur in Zone No.05 for the period ending 30.06.2027.
Open e-tender for Repairs, maintenance & execution of all works including new works [i.e. General work, Wood works, Water Pipeline, Road work and sanitary works] for all service buildings, staff quarters, coaching depot, running room, Loco shed, Circulating area, Platforms & Sheds and other service buildings etc. at Bhagalpur under AEN/Bhagalpur in Zone No.01 for the period ending 30.06.2027.