Loading…
Loading…
11,193 results • Best match
Construction of Cement Concrete Road at h/o Vishal Kotia (h.no. 6/161) to h/o Rajkumari front of Aashriwad nursing home, Prakash nagar, Agra, Distt-Agra.
CEMENT CONCRETE PAVEMENT(C.C ROAD) Construction of un-reinforcement plain cement concrete pavment thickness as per design, over a prepared ...
Construction of cc Road and Drain At Ward no 04 Prem Mau Katra Ram Chandra Gupta House to Panni Darji House
Construction of cc Road and Drain At Ward no 04 Prem Mau Katra Ram Chandra Gupta House to Panni Darji House
Construction of 30ft. Road and Drain at Kh.No. 2379 to 2392 in Revenue Village Bedla near Vaidehi Appartment. 2312
Item Code [road 2025 3.14]:Item Type [road] :: Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads ,transporting to site,spreading ,grading to required slope and compacted to meet requirement of Table300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3
Construction of Bus Shelter at Bhovanahlly village and Construction of Bus Shelter at SMK Nagar near Hassan - Arasikere road in HUDA Limit
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates... charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse ...
Construction of Internal C.C. Road and Closed Drain at Ambejawalge Taluka and District Dharashiv District Annual Plan Special Urban Amenities 2025-26
Item No.4:-Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . Addn.Spec.No.As directed by Engineer-in-charge (SSR 22-23 It.No.50.58)
Construction and maintenance of road from L712-RD Road to Gugudari Galu Sahi under PMGSY-IV Batch-I for the Package No.OR-17-704 in the District of Keonjhar.
Routine Maintenance (For Road Works) after completion of construction works (Lump-sum Amount for each year Per Km)