Loading…
Loading…
11,310 results • Best match
57.Construction of interlocking road, drain, and slab from interlocking road to Upnesh Yadav house in Laxmipuram Colony opposite PAC Battalion Gate No. 1.
Earth work in embankment mechanically compacted to 95% proctor density in ordinary soil excavation to be done in form of regular pits not exceeding ½ M in depth and earth work to be done in 20 cm. layers including ramming and dressing pulvarization the surface ...
CONSTRUCTION OF INTERNAL C.C. ROAD FROM GANGADHAR JADHAV TO BHAGWAN BELKAR AND MAROTI MANDIR TO MAIN ROAD AT MANUR VILLAGE TQ. NAIGAON DIST. NANDED
CONSTRUCTION OF INTERNAL C.C. ROAD FROM GANGADHAR JADHAV TO BHAGWAN BELKAR AND MAROTI MANDIR TO MAIN ROAD AT MANUR VILLAGE TQ. NAIGAON DIST. NANDED
Construction of a permanent cement concrete (CC) road for cleanliness, extending from the asphalt road towards Jeteshwar Tiraha (junction) in Loteshwar Gram Panchayat (Kesuri).
Construction of interlocking road side patri both side from shahbad road to culvert of shamshan ghat in Moh Shiv Vihar Ward no-1 Rampur
M-150 brick work in 1:4 with one cement and four course sand mortar in foundation and plinth (Substructure) inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work.
construction of Paver blocks Road from Munna kirana shop in main road to joda shiv mandir in Ward No 27 Under Nagar Parishad Sahibganj
Granular Sub-Base with Graded Material (Table:- 400-1) by mix place method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-II material RCD SOR 4.01 B(ii)
cc Road construction arjun bagari ke house se sukhadev ke Palot tak ward 38
Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km)