Loading…
Loading…
11,629 results • Best match
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
G E N E R A L - S a b a r i m a l a 2 0 2 5 - 2 6 - Improvements to Oottukuzhi Cherukodu Kattaikkodu Road- Investigation for retaining Wall construction Near Kadambu Paara Viewpoint Entrance-Investigation works- Investigation Work
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
21. CC road and drain construction work from Jagat house to Jagdish house in Ward No 20
1. Drain and interlocking construction work from Riyajul house to Faiyaz house in Ward No 20
Construction of RCC flooring development works in trailer parking area near 100T West Pit Road Weighbridge at Talaipalli CMP
Total value of work as per bid document
MLA-SDF-2025-26 Construction of Mosco - Kannampally - Pathil chira road-in W-16, Madappally GP-General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Bulbulchandi Katlapukur Road from 4.50 km to 6.890 km and from 7.025 km to 14.500 km (excluding 492.00 mtrs existing Mastic Zone), Surfacing work under Malda Highway Division in the District of Malda. Project lD PD252648174S000 (2nd CALL).
Providing and applying primer coat with SS-1 grade Cationic Bitumen Emulsion (PACKED) of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). Over WBM / WMM Surface @ 0.85kg/sqm)