Loading…
Loading…
11,152 results • Best match
Construction of Concrete Lane from Main Road to House of Gh Qadir Wani at Gantalipora BLOCK BIJBEHARA
CONSTRUCTION OF TILE LANE FROM MAIN ROAD TO HOUSE OF GH RASOOL THOKEROO AT GADISEER BLOCK BIJBEHARA
Construction of path from main road to house of Makhan Din and Others Pyt Najote Block Duggain
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed
Renewal of Transport Nagar Phase-I and Phase-II Bituminous Roads with Drainage, Strengthening of Parking Area, and Construction of Interlocking Tile Road from Delhi -Dehradun Road to West Canal Road adjacent Raja Rammohan School, Dehradun
... bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal ...
Construction of RCC Drain and Repair of Footpath at Road No. 28, 100 Patel Chowk Road, 100 New Khyala Road and Sakti Mandir Marg (Both Side) under PWD Division West Road-1 (M-111), under Sub-Division WR-15, New Delhi.
... avoid from overturning by providing 250 mm long expansion fasteners at both ends. The work shall be executed as per drawing/ direction of Engineer-in-Charge which includes writing... writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape ...
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Pakage GJ25P12(Total 5 Roads, 5.97 Km) Tal. Kaprada. Dist. Valsad
Earth in excavation of foundation of structure as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. as per Technical Specification Clause 304